Multinational - Kenya-Tanzania Power Interconnection Project
One of 4,322 projects Taiyo tracks in Multinational.
Source: African Development Bank (AfDB)
The project involves the construction of a high voltage alternating current (HVAC) 400 kV transmission line (T-line) with a total length of 507.5 km, of which about 414.4 km are located in Tanzania and 93.1 km in Kenya. In Tanzania, the project includes the construction of a 400 kV substation in Arusha and the extension of the existing Singida substation. In Kenya, the project does not involve any
- Sector
- Power Transmission, Power Generation (CCGT), Hydro, Geothermal, Road, Education, Government
- Location
- World
- Updated
- 22 Jul 2026
- Source
- African Development Bank (AfDB)
ConstructChat
Ask ConstructChat about Multinational - Kenya-Tanzania Power Interconnection Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involves the construction of a high voltage alternating current (HVAC) 400 kV transmission line (T-line) with a total length of 507.5 km, of which about 414.4 km are located in Tanzania and 93.1 km in Kenya. In Tanzania, the project includes the construction of a 400 kV substation in Arusha and the extension of the existing Singida substation. In Kenya, the project does not involve any works related to substations. Indeed, the substation outgoing bay in Isinya is part of the existing Nairobi Reinforcement project which is currently under construction. The proposed interconnection line, to be connected to the EthiopiaKenya transmission system through the Isinya – Suswa 400 kV line, is part of the Eastern Africa Electricity Highway, with a transfer capacity of 2000 MW. As such, it will be the major link for power transfer between the Eastern Africa Power Pool and countries in the North such Sudan and Egypt. Completion of the line is expected in early 2017. |
Original sector | Energy |
Budget |
Location
Country | World |
Source
Source | African Development Bank (AfDB) |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Power Generation (CCGT), Hydro, Geothermal, Road, Education, Government |
Article published date | 2025-03-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Transmission projects in Multinational
- Multinational - The Interconnection of Electric Grids of Nile Equatorial Lakes Countries (Grant to the Republic of Burundi)
- Multinational- Ruzizi III regional hydropower plant project
- Multinational- Ruzizi III regional hydropower plant project (Rwanda)
- Multinational - Uganda – DRC Power Transmission Study
- Multinational - The Interconnection of Electric Grids of Nile Equatorial Lakes Countries (Supplementary Loan to the Republic of Uganda)
- Multinational - Enhancing post-pandemic resilience and AfCTFA participation by developing SME and private sector
- Multinational - Côte d’Ivoire, Liberia, Sierra Leone and Guinea (CLSG) Electricity Networks Interconnection Project
- Multinational - Desert to Power Initiative West Africa Regional Energy Program – Phase I
