logo

Multinational - Lake Victoria Maritime Communications and Transport Project

Sector: Water Supply and Storage • Location: Multinational

Source: African Development Bank (AfDB)

Project

The Multinational Lake Victoria Maritime Communication and Transport Project is designed within the 4th EAC Development Strategy (2011-2016) and will contribute to the EAC’s Vision for the Lake Victoria basin to build “a prosperous population living in a healthy and sustainably managed environment providing equitable opportunities and benefits”. The project addresses the maritime transportation an

Project Information FAQ

Project Information

4 Q
The project “Multinational - Lake Victoria Maritime Communications and Transport Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Multinational. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Multinational Lake Victoria Maritime Communication and Transport Project is designed within the 4th EAC Development Strategy (2011-2016) and will contribute to the EAC’s Vision for the Lake Victoria basin to build “a prosperous population living in a healthy and sustainably managed environment providing equitable opportunities and benefits”. The project addresses the maritime transportation and navigation safety intervention area and will contribute to the provision of safe, efficient transport links, and to the safe conduct of fishing activities that are essential to achieving the goals of poverty reduction and sustainable development. It addresses significant safety of life and transport planning issues on Lake Victoria to encourage increased transport and trade on the Lake. The project is an intervention by EAC to reduce maritime accidents, save lives, improve security and bring efficient and affordable communications to the Lake Victoria communities. Safe maritime operations will attract investments in lake transport, tourism and water sports. The implementation of the project is expected to take four years with an estimated total cost of UA 25.95 million (USD 36,583,822).

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data