logo

Multinational - Lakes Edward and Albert Integrated Fisheries and Water Resources Management Project (LEAF II)

Sector: Raw Materials • Location: Multinational

Source: African Development Bank (AfDB)

Project

The Multinational Lakes Edward & Albert Integrated Fisheries & Water Resources Management Project (LEAF II) covers the Lakes Edward and Albert basin, which are part of the series of Rift valley lakes shared between the Democratic Republic of Congo and the Republic of Uganda. The Lakes and their catchment cover an area of about 622,472 km² and have an estimated population of about 12 million pe

Project Information FAQ

Project Information

4 Q
The project “Multinational - Lakes Edward and Albert Integrated Fisheries and Water Resources Management Project (LEAF II)” is an infrastructure initiative in the Raw Materials sector, located in Multinational. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Multinational Lakes Edward & Albert Integrated Fisheries & Water Resources Management Project (LEAF II) covers the Lakes Edward and Albert basin, which are part of the series of Rift valley lakes shared between the Democratic Republic of Congo and the Republic of Uganda. The Lakes and their catchment cover an area of about 622,472 km² and have an estimated population of about 12 million persons. The Lakes are characterized by over exploitation of main fisheries species, deforestation, insecurity as well as climate change impact all compounding the poverty levels in these areas. The project’s estimated total cost is UA16.76million, comprising an ADF resources of UA 11.00 million (UA 5 million as loan to Uganda and UA 6 million as grant to DRC) , a co-financing of GEF grant of UA 5.532 million and a UA0.228 million contributions from NELSAP. It will be implemented over a five-year period through 3 components namely: 1) Fisheries Resources Development; 2) Integrated Water Resources Management and 3) Project Management and Coordination.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data