Multinational - Mano River Union Road Development and Transport Facilitation Programme, Phase II
The status, timeline and source of this project. A free account opens every field.
Source: African Development Bank (AfDB)
The Road Development and Transport Facilitation Programme – Phase 2, is a regional initiative to develop and pave a total of 67.1 km of road linking the South-eastern Liberia and western part of Cote D’Ivoire. The road sections concerned are: (i) Development of 20 km road from Fish Town to Kelipo (River Gee County in Liberia) and (ii) Development of 47.1 km from Sanniquellie to Loguatuo of Liberia
- Sector
- Forest Products and Packaging, Government, Bridge, Road
- Location
- World
- Updated
- 22 Jul 2026
- Source
- African Development Bank (AfDB)
ConstructChat
Ask ConstructChat about Multinational - Mano River Union Road Development and Transport Facilitation Programme, Phase II
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Road Development and Transport Facilitation Programme – Phase 2, is a regional initiative to develop and pave a total of 67.1 km of road linking the South-eastern Liberia and western part of Cote D’Ivoire. The road sections concerned are: (i) Development of 20 km road from Fish Town to Kelipo (River Gee County in Liberia) and (ii) Development of 47.1 km from Sanniquellie to Loguatuo of Liberia, up to the Border town of Gbeunta in Cote D’Ivoire. These road sections are still dirt roads, barely 6 metres wide and impassable for most of the year. The bridges spanning the numerous rivers in the area are built of makeshift timber and they have numerous road checkpoints and ill-adapted border posts that render journeys long and fastidious. This calls for the development and paving of the roads, construction of 36.55-meter span bridge on the Nuon River connecting Liberia and Côte d’Ivoire at the Loguatuo/Gbeunta Border and the construction of joint border control posts. The programme will be executed from January 2019 to December 2022 for an estimated total cost of UA 61.88 million. |
Original sector | Transport & Storage |
Budget |
Location
Country | World |
Source
Source | African Development Bank (AfDB) |
URL |
More Details
Record type | Project |
Sector | Forest Products and Packaging, Government, Bridge, Road |
Article published date | 2026-03-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Forest Products and Packaging projects in Multinational
- Multinational - Macroeconomic Stability and Financial Integration Project in Southern Africa Development Community
- Multinational - Ketta-Djoum Road Development and Yaoundé-Brazzaville Corridor Transport Facilitation Project – Phase 2 (Cameroon)
- Comoros - Climate Disaster Risk Financing Project
- Multinational - ECCAS Institutional Capacity Building Support Project (PARCI-ECCAS)
- Multinational - Ketta-Djoum Road Development and Yaoundé-Brazzaville Corridor Transport Facilitation Project – Phase 2 (République du Congo)
- Multinational - Micro-Entrepreneurship and Green Jobs in Natural Reserve for Vulnerable Populations in Ghana and Senegal
- Multinational - Conservation Concession in Equateur Province, DRC
- Multinational - Project to Support the Central African Unified Financial Market
