Multinational - Mano River Union Road Development and Transport Facilitation Programme, Phase II
Sector: Bridge • Location: Multinational
Source: African Development Bank (AfDB)
The Road Development and Transport Facilitation Programme – Phase 2, is a regional initiative to develop and pave a total of 67.1 km of road linking the South-eastern Liberia and western part of Cote D’Ivoire. The road sections concerned are: (i) Development of 20 km road from Fish Town to Kelipo (River Gee County in Liberia) and (ii) Development of 47.1 km from Sanniquellie to Loguatuo of Liberia
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Obfuscated Data |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Road Development and Transport Facilitation Programme – Phase 2, is a regional initiative to develop and pave a total of 67.1 km of road linking the South-eastern Liberia and western part of Cote D’Ivoire. The road sections concerned are: (i) Development of 20 km road from Fish Town to Kelipo (River Gee County in Liberia) and (ii) Development of 47.1 km from Sanniquellie to Loguatuo of Liberia, up to the Border town of Gbeunta in Cote D’Ivoire. These road sections are still dirt roads, barely 6 metres wide and impassable for most of the year. The bridges spanning the numerous rivers in the area are built of makeshift timber and they have numerous road checkpoints and ill-adapted border posts that render journeys long and fastidious. This calls for the development and paving of the roads, construction of 36.55-meter span bridge on the Nuon River connecting Liberia and Côte d’Ivoire at the Loguatuo/Gbeunta Border and the construction of joint border control posts. The programme will be executed from January 2019 to December 2022 for an estimated total cost of UA 61.88 million. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Bridge projects in Multinational
- Multinational - Post Cyclone Idai and Kenneth Emergency Recovery and Resilience Programme (PCIREP) – Mozambique
- Multinational - Interconnection of the Electric Grids of the Nile Equatorial Lakes Countries
- Multinational (Cameroon - Nigeria) - Transport Facilitation Program Corridor - Bamenda-Enugu- (PAGODA Supplemental Grant)
- Multinational - Bissau - Dakar Road Corridor Improvement Project - Phase 1 - Farim-Tanaff-Sandinieri Road Development
- Multinational - Feasibility studies for the construction of a bridge over the Oubangui River, the development of missing links in the Bangui-Kisangani-Kampala and Kisangani-Bujumbura road corridors, and Transport, Trade and Transit Facilitation along the two corridors
- Multinational - The Study on the Road-Rail Bridge between Kinshasa and Brazzaville and the Kinshasa-Ilebo Railroad (Grant to the Democratic Republic of Congo)
- Multinational (Mauritania-Senegal) - Studies of an economic corridor between Nouadhibou - Nouakchott - Rosso - Dakar
- Multinational - Feasability Study of the Extension of the Kinshasa-Ilebo Railway