Multinational - Mano River Union Road Development and Transport Facilitation Programme, Phase II
Sector: Bridge • Location: Multinational
Source: African Development Bank (AfDB)
The Road Development and Transport Facilitation Programme – Phase 2, is a regional initiative to develop and pave a total of 67.1 km of road linking the South-eastern Liberia and western part of Cote D’Ivoire. The road sections concerned are: (i) Development of 20 km road from Fish Town to Kelipo (River Gee County in Liberia) and (ii) Development of 47.1 km from Sanniquellie to Loguatuo of Liberia
- Sector
- Bridge, Forest Products and Packaging, Road, Government
- Location
- World
- Updated
- 22 Jul 2026
- Source
- African Development Bank (AfDB)
ConstructChat
Ask ConstructChat about Multinational - Mano River Union Road Development and Transport Facilitation Programme, Phase II
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Road Development and Transport Facilitation Programme – Phase 2, is a regional initiative to develop and pave a total of 67.1 km of road linking the South-eastern Liberia and western part of Cote D’Ivoire. The road sections concerned are: (i) Development of 20 km road from Fish Town to Kelipo (River Gee County in Liberia) and (ii) Development of 47.1 km from Sanniquellie to Loguatuo of Liberia, up to the Border town of Gbeunta in Cote D’Ivoire. These road sections are still dirt roads, barely 6 metres wide and impassable for most of the year. The bridges spanning the numerous rivers in the area are built of makeshift timber and they have numerous road checkpoints and ill-adapted border posts that render journeys long and fastidious. This calls for the development and paving of the roads, construction of 36.55-meter span bridge on the Nuon River connecting Liberia and Côte d’Ivoire at the Loguatuo/Gbeunta Border and the construction of joint border control posts. The programme will be executed from January 2019 to December 2022 for an estimated total cost of UA 61.88 million. |
Original sector | Transport & Storage |
Budget |
Location
Country | World |
Source
Source | African Development Bank (AfDB) |
URL |
More Details
Record type | Project |
Sector | Bridge, Forest Products and Packaging, Road, Government |
Article published date | 2025-03-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Bridge projects in Multinational
- Multinational - Kampala-Juba-Addis Ababa-Djibouti Corridor Project
- Multinational - Mtwara Development Corridor
- Multinational - Road Improvement and Transport Facilitation Programme on the Southbound Bamako-Dakar corridor (Kati-Kita-Saraya-Kedougou-Dakar)
- Multinational - Mano River Union Road Development and Transport Facilitation Programme, Phase III-Sierra Leone
- Multinational - Post Cyclone Idai and Kenneth Emergency Recovery and Resilience Programme (PCIREP) – Mozambique
- Multinational - Interconnection of the Electric Grids of the Nile Equatorial Lakes Countries
- Multinational (Cameroon - Nigeria) - Transport Facilitation Program Corridor - Bamenda-Enugu- (PAGODA Supplemental Grant)
- Multinational - Bissau - Dakar Road Corridor Improvement Project - Phase 1 - Farim-Tanaff-Sandinieri Road Development
