Multinational - Mano River Union Road Development and Transport Facilitation Programme, Phase II

Sector: Bridge • Location: Multinational

Source: African Development Bank (AfDB)

The Road Development and Transport Facilitation Programme – Phase 2, is a regional initiative to develop and pave a total of 67.1 km of road linking the South-eastern Liberia and western part of Cote D’Ivoire. The road sections concerned are: (i) Development of 20 km road from Fish Town to Kelipo (River Gee County in Liberia) and (ii) Development of 47.1 km from Sanniquellie to Loguatuo of Liberia

Sector
Bridge, Forest Products and Packaging, Road, Government
Location
World
Updated
22 Jul 2026
Source
African Development Bank (AfDB)

ConstructChat

Ask ConstructChat about Multinational - Mano River Union Road Development and Transport Facilitation Programme, Phase II

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Multinational - Mano River Union Road Development and Transport Facilitation Programme, Phase II” is an infrastructure initiative in the Bridge sector, located in Multinational. Taiyo aggregates data on it from African Development Bank (AfDB).

Participants

Sponsoring Agency

Status

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Road Development and Transport Facilitation Programme – Phase 2, is a regional initiative to develop and pave a total of 67.1 km of road linking the South-eastern Liberia and western part of Cote D’Ivoire. The road sections concerned are: (i) Development of 20 km road from Fish Town to Kelipo (River Gee County in Liberia) and (ii) Development of 47.1 km from Sanniquellie to Loguatuo of Liberia, up to the Border town of Gbeunta in Cote D’Ivoire. These road sections are still dirt roads, barely 6 metres wide and impassable for most of the year. The bridges spanning the numerous rivers in the area are built of makeshift timber and they have numerous road checkpoints and ill-adapted border posts that render journeys long and fastidious. This calls for the development and paving of the roads, construction of 36.55-meter span bridge on the Nuon River connecting Liberia and Côte d’Ivoire at the Loguatuo/Gbeunta Border and the construction of joint border control posts. The programme will be executed from January 2019 to December 2022 for an estimated total cost of UA 61.88 million.

Original sector

Transport & Storage

Budget

Location

Country

World

Source

Source

African Development Bank (AfDB)

URL

More Details

Record type

Project

Sector

Bridge, Forest Products and Packaging, Road, Government

Article published date

2025-03-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project