logo

Multinational - Mano River Union Road Development and Transport Facilitation Programme, Phase III-Sierra Leone

Sector: Commercial • Location: Multinational

Source: African Development Bank (AfDB)

Project

This intervention concerns the Mano River Union Road Development and Transport Facilitation programme (MRU/RDTFP), Phase III. It aims to build resilience at the community and regional levels where inadequate physical infrastructure, particularly in the energy, water, and road sectors. The design of the Programme has taken into consideration the fragility of the region resulting from the protracted

Project Information FAQ

Project Information

4 Q
The project “Multinational - Mano River Union Road Development and Transport Facilitation Programme, Phase III-Sierra Leone” is an infrastructure initiative in the Commercial sector, located in Multinational. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

This intervention concerns the Mano River Union Road Development and Transport Facilitation programme (MRU/RDTFP), Phase III. It aims to build resilience at the community and regional levels where inadequate physical infrastructure, particularly in the energy, water, and road sectors. The design of the Programme has taken into consideration the fragility of the region resulting from the protracted civil war which weakened institutional capacity, as well as the high vulnerability of the roads to heavy rains and floods. This Phase 3 of the Programme will consist of: (i) the development and asphalting of: (i) 89 km of road, including 50 km in Liberia and 25 km in Sierra Leone to be upgraded according to ECOWAS standards (7m of pavement and two shoulders of 1.5m each with an asphalt concrete structure); (ii) road studies on 197 km , including 27 km in Guinea, 90km in Sierra Leone and 80 km in Liberia (iii) the construction of a 276 meters bridge over the Makona (Moa) River between Guinea and Sierra Leone.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data