logo
Project

Multinational - Mozambique - Zambia 400KV Power Interconnector Project

Sector: Hydro • Location: Multinational

Source: African Development Bank (AfDB)

The Mozambique - Zambia 400KV Power Interconnector Project consists of a high voltage transmission line from Chipata 330/132/33 kV substation to the Cataxa substation in Mozambique as well as the construction of a transmission line that connects Cahora Bassa Hydroelectric Power Station at Songo in Mozambique with the power system of Zambia at Serenje. The project directly support the African Union

Sector
Hydro, Power Transmission, Power Generation (CCGT), Commercial, Government
Location
World
Updated
22 Jul 2026
Source
African Development Bank (AfDB)

ConstructChat

Ask ConstructChat about Multinational - Mozambique - Zambia 400KV Power Interconnector Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Multinational - Mozambique - Zambia 400KV Power Interconnector Project” is an infrastructure initiative in the Hydro sector, located in Multinational. Taiyo aggregates data on it from African Development Bank (AfDB).

Participants

Sponsoring Agency

Status

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Mozambique - Zambia 400KV Power Interconnector Project consists of a high voltage transmission line from Chipata 330/132/33 kV substation to the Cataxa substation in Mozambique as well as the construction of a transmission line that connects Cahora Bassa Hydroelectric Power Station at Songo in Mozambique with the power system of Zambia at Serenje. The project directly support the African Union’s Programme for Infrastructure Development in Africa (PIDA), especially North-South Power Transmission Corridor. The Mozambique–Zambia Interconnector project will go a long way to mitigate the congestion in the SAPP network. The NEPAD-IPPF grants are to help fund full feasibility studies, including detailed design and tender documents of the proposed high-voltage direct current (HVDC) 330-/400-kV transmission lines within two years. This support includes one component consisting of the following sub components: • Feasibility Study, Detailed Design, Tender Documents and Terms of References for supervision consultant; • Environmental and Social Impact Assessment (ESIA); and • Resettlement Action Plan (RAP).

Original sector

Energy

Budget

Location

Country

World

Source

Source

African Development Bank (AfDB)

URL

More Details

Record type

Project

Sector

Hydro, Power Transmission, Power Generation (CCGT), Commercial, Government

Article published date

2026-03-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project