Multinational - Mozambique - Zambia 400KV Power Interconnector Project
Sector: Hydro • Location: Multinational
Source: African Development Bank (AfDB)
The Mozambique - Zambia 400KV Power Interconnector Project consists of a high voltage transmission line from Chipata 330/132/33 kV substation to the Cataxa substation in Mozambique as well as the construction of a transmission line that connects Cahora Bassa Hydroelectric Power Station at Songo in Mozambique with the power system of Zambia at Serenje. The project directly support the African Union
- Sector
- Hydro, Power Transmission, Power Generation (CCGT), Commercial, Government
- Location
- World
- Updated
- 22 Jul 2026
- Source
- African Development Bank (AfDB)
ConstructChat
Ask ConstructChat about Multinational - Mozambique - Zambia 400KV Power Interconnector Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Mozambique - Zambia 400KV Power Interconnector Project consists of a high voltage transmission line from Chipata 330/132/33 kV substation to the Cataxa substation in Mozambique as well as the construction of a transmission line that connects Cahora Bassa Hydroelectric Power Station at Songo in Mozambique with the power system of Zambia at Serenje. The project directly support the African Union’s Programme for Infrastructure Development in Africa (PIDA), especially North-South Power Transmission Corridor. The Mozambique–Zambia Interconnector project will go a long way to mitigate the congestion in the SAPP network. The NEPAD-IPPF grants are to help fund full feasibility studies, including detailed design and tender documents of the proposed high-voltage direct current (HVDC) 330-/400-kV transmission lines within two years. This support includes one component consisting of the following sub components: • Feasibility Study, Detailed Design, Tender Documents and Terms of References for supervision consultant; • Environmental and Social Impact Assessment (ESIA); and • Resettlement Action Plan (RAP). |
Original sector | Energy |
Budget |
Location
Country | World |
Source
Source | African Development Bank (AfDB) |
URL |
More Details
Record type | Project |
Sector | Hydro, Power Transmission, Power Generation (CCGT), Commercial, Government |
Article published date | 2026-03-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Hydro projects in Multinational
- Ghana - Togo - Benin Power Interconnect
- Multinational- Ruzizi III regional hydropower plant project
- Multinational - Scaling-up the Clean Cooking Industry in Africa
- Multinational- Ruzizi III regional hydropower plant project (Rwanda)
- Multinational - Study on the Development of Inga Hydropower Site and Associated Power Interconnections
- Multinational - Programme to Build Resilience to Food and Nutrition Insecurity in the Sahel (P2RS)
- Multinational - The Interconnection of Electric Grids of Nile Equatorial Lakes Countries (Supplementary Loan to the Republic of Uganda)
- Multinational - Project for the Integrated Management of Invasive Aquatic Weeds in West Africa - Gambia component
