logo

Multinational - NEPAD-IPPF - Access Roads and Connection Routes to the Future Road-Rail Bridge Between Congo and DRC

Sector: Rail • Location: Multinational

Source: African Development Bank (AfDB)

Project

The preparatory activities for which the NEPAD-IPPF assistance is requested concern the feasibility studies, detailed engineering designs, environmental and social impact assessments (ESIA) and preparation of bidding documents in view of the construction of the Yie - Maloukou Trechot road (26 km) and the upgrading of the Yie – Special economic zone of Maloukou Trechot road (23 km) in the Republic

Project Information FAQ

Project Information

4 Q
The project “Multinational - NEPAD-IPPF - Access Roads and Connection Routes to the Future Road-Rail Bridge Between Congo and DRC” is an infrastructure initiative in the Rail sector, located in Multinational. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The preparatory activities for which the NEPAD-IPPF assistance is requested concern the feasibility studies, detailed engineering designs, environmental and social impact assessments (ESIA) and preparation of bidding documents in view of the construction of the Yie - Maloukou Trechot road (26 km) and the upgrading of the Yie – Special economic zone of Maloukou Trechot road (23 km) in the Republic of Congo. The said activities to be carried out in the Republic of Congo also include Technical Assistance (TA) to the executing agency and related tasks, as well as auditing services. The overall outputs of the planned studies in both countries will be technical reports enabling, in phase 2, the physical implementation of the envisaged road infrastructures on each side of the bridge. The estimated overall duration of the studies is 12 months, starting from award and signing of study services’ contract.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data