Multinational - Nigeria-Niger-Benin-Burkina Faso Power Interconnection Project

Sector: Commercial • Location: Multinational

Source: African Development Bank (AfDB)

Project

The Nigeria-Benin-Niger-Burkina-Faso Power Interconnection Project, also called the North Backbone Project, involves the construction of a 330 kV double-circuit line over 842 km with transformer substations. The project aims to help lift the following power sub-sector constraints in the countries of the hinterland: (i) the structural generation deficit relative to electricity demand; (ii) the high

Project Information FAQ

Project Information

4 Q
The project “Multinational - Nigeria-Niger-Benin-Burkina Faso Power Interconnection Project” is an infrastructure initiative in the Commercial sector, located in Multinational. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Nigeria-Benin-Niger-Burkina-Faso Power Interconnection Project, also called the North Backbone Project, involves the construction of a 330 kV double-circuit line over 842 km with transformer substations. The project aims to help lift the following power sub-sector constraints in the countries of the hinterland: (i) the structural generation deficit relative to electricity demand; (ii) the high proportion of thermal electricity, whose cost price is relatively high and which contributes to harming the environment; (iii) the low financial capacity of national electricity companies; (iv) the very limited extent of the high voltage power transmission network, which is an obstacle to energy exchanges among ECOWAS countries; and (v) the low access of the population to electricity. Two double-circuit 450 MW lines will be installed. The project will allow for power exchange among the four countries and with neighbouring countries to which they are interconnected, as well as electrification of 394 localities situated along the line within a 5 km radius. Estimated to cost UA 514.55 million, the project will be implemented over five years (2018-2022).

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data