Multinational - Nigeria-Niger-Benin-Burkina Faso Power Interconnection Project
Sector: Commercial • Location: Multinational
Source: African Development Bank (AfDB)
The Nigeria-Benin-Niger-Burkina-Faso Power Interconnection Project, also called the North Backbone Project, involves the construction of a 330 kV double-circuit line over 842 km with transformer substations. The project aims to help lift the following power sub-sector constraints in the countries of the hinterland: (i) the structural generation deficit relative to electricity demand; (ii) the high
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Obfuscated Data |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Nigeria-Benin-Niger-Burkina-Faso Power Interconnection Project, also called the North Backbone Project, involves the construction of a 330 kV double-circuit line over 842 km with transformer substations. The project aims to help lift the following power sub-sector constraints in the countries of the hinterland: (i) the structural generation deficit relative to electricity demand; (ii) the high proportion of thermal electricity, whose cost price is relatively high and which contributes to harming the environment; (iii) the low financial capacity of national electricity companies; (iv) the very limited extent of the high voltage power transmission network, which is an obstacle to energy exchanges among ECOWAS countries; and (v) the low access of the population to electricity. Two double-circuit 450 MW lines will be installed. The project will allow for power exchange among the four countries and with neighbouring countries to which they are interconnected, as well as electrification of 394 localities situated along the line within a 5 km radius. Estimated to cost UA 514.55 million, the project will be implemented over five years (2018-2022). |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
