The NEPA – CEB Multinational Power Interconnection Project is part of a much wider project, which will allow greater power exchange between countries of the West African sub-region. The project will supply electricity from Nigeria to Togo and Benin through a 330 kV transmission line. On the Nigerian side, the line will be connected to the existing Ikeja West 330 kV substation, where electricity is

Project Information FAQ

Project Information

4 Q
The project “Multinational - Nigeria-Togo-Benin Power System Interconnexion Project” is an infrastructure initiative in the Power Transmission sector, located in Multinational. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The NEPA – CEB Multinational Power Interconnection Project is part of a much wider project, which will allow greater power exchange between countries of the West African sub-region. The project will supply electricity from Nigeria to Togo and Benin through a 330 kV transmission line. On the Nigerian side, the line will be connected to the existing Ikeja West 330 kV substation, where electricity is directly supplied from NEPA and privately owned power stations. On the Togo/Benin side, the line will end at the newly erected Sakete substation in Benin where it will feed a transformer, which will step down the voltage from 330 kV to 161 kV for connection to the existing CEB 161 kV transmission lines. The electricity will then be transported, by the CEB transmission grid, to various parts of Togo and Benin and, in limited quantities, to Ghana through the lines presently used for import by the CEB. The project consists of the following components: (i) construction of a 330 kV transmission line with a length of 70 km from Ikeja in Nigeria to Sakete in Benin, (ii) extension of an existing 330 kV substation at Ikeja and construction of a new 330/161 kV substation in Sakete, (iii) mitigation of environmental and social impacts, (iv) provision of consultancy services and (v) project management. Its implementation will create a big electricity market across national boundaries, thereby encouraging private investors to build gas-fired power stations in Nigeria for electricity generation and export. The 330 kV line will later be extended to Togo, Ghana and Côte d’Ivoire, where it will be connected to the existing transmission grids in those countries. The total cost, net of taxes, is estimated at US$ 46.59 million (UA 35.02 million).

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data