Multinational - PIDA Implementation Support Project (PISP)
Sector: Water Supply and Storage • Location: Multinational
Source: African Development Bank (AfDB)
The proposed intervention is a Technical Assistance Project designed to facilitate the development and implementation of Programme for Infrastructure Development in Africa (PIDA - PAP 2) priority projects. The proposed investment by the Bank in this project will complement support being provided to the PIDA programme from other Development Partners, notably the European Union (EU) and the German D
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Obfuscated Data |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The proposed intervention is a Technical Assistance Project designed to facilitate the development and implementation of Programme for Infrastructure Development in Africa (PIDA - PAP 2) priority projects. The proposed investment by the Bank in this project will complement support being provided to the PIDA programme from other Development Partners, notably the European Union (EU) and the German Development Agency (GIZ). The PIDA Implementation Support Project (PISP) will be implemented through a collaborative effort with all active and interested development partners supporting the PIDA programme. Implementation of the PISP will help to accelerate the implementation of Africa’s priority and transformative continental and regional infrastructure projects deepening integration and fostering economic growth. The significant deficit in Africa’s infrastructure leads to increased production and transaction costs, reduced competitiveness of businesses, and negative impact on foreign direct investment flows to the continent and therefore limits the rate of economic and social development on the continent. The total project cost is estimated at UA 5.5 million to be financed by an ADF Grant (UA 5 million) from the Regional Operations envelop, Regional Public Goods (RPG) window, and African Union Development Agency (AUDA NEPAD) counterpart funding (USD 0.5) million. The project is scheduled to be completed over a 48-month period and shall comprise three components (i) Technical Assistance for Implementation of PIDA PAP 2, (ii) Support to Continental PIDA Policy and Strategic Advocacy and, (iii) Program Monitoring & Evaluation. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Water Supply and Storage projects in Multinational
- Multinational (Democratic Republic of Congo / Angola) - The Democratic Republic of Congo - Angola Trans-National Economic Corridor Construction Project – Phase 1
- Multinational - Post Cyclone Idai and Kenneth Emergency Recovery and Resilience Programme (PCIREP) – Mozambique
- Multinational - Interconnection of the Electric Grids of the Nile Equatorial Lakes Countries
- Multinational - Project to Interconnect the Power Grids from the Boali Hydro-Power System - Phase I
- Multinational (Cameroon - Nigeria) - Transport Facilitation Program Corridor - Bamenda-Enugu- (PAGODA Supplemental Grant)
- Multinational - Baynes Hydro Power Project between Angola and Namibia 600 MW Advisory - Angola
- Multinational- Ruzizi III regional hydropower plant project (Burundi)
- Multinational - Feasibility study of the Nyimur Multipurpose Water Resources Project
