logo
Project

Multinational - Power Interconnection Project

Sector: Manufacturing (Industrial) • Location: Multinational

Source: African Development Bank (AfDB)

The Ethiopia-Djibouti Power Interconnection Project (component of Ethiopia) deals with the interconnection of electricity grids between Ethiopia and Djibouti with the aim of making possible power trade between the two countries and allow the sharing of cheap hydropower resources of Ethiopia. As such, the project should help reduce the cost of energy and contribute to poverty reduction by encouragi

Sector
Manufacturing (Industrial), Commercial, Power Transmission, Power Generation (CCGT), Hydro, Government
Location
World
Updated
22 Jul 2026
Source
African Development Bank (AfDB)

ConstructChat

Ask ConstructChat about Multinational - Power Interconnection Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Multinational - Power Interconnection Project” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in Multinational. Taiyo aggregates data on it from African Development Bank (AfDB).

Participants

Sponsoring Agency

Status

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Ethiopia-Djibouti Power Interconnection Project (component of Ethiopia) deals with the interconnection of electricity grids between Ethiopia and Djibouti with the aim of making possible power trade between the two countries and allow the sharing of cheap hydropower resources of Ethiopia. As such, the project should help reduce the cost of energy and contribute to poverty reduction by encouraging industrial and commercial development that should create jobs in both countries. The project would (i) immediately provide clean, cheap and reliable energy to the population of twelve (12) towns in Ethiopia and 36-72 percent of yearly energy supply to Djibouti during its life and (ii) enable further electrification of the surrounding areas at little incremental cost, thus improving the quality of life of the population and advancing socio-economic development. It should also develop human capacity and improve financial management and control systems to contribute to the efficient and sustained operations of power utilities in Djibouti and Ethiopia. The project comprises the following components: (A) Development of Power Transmission Network (construction of transmission lines and substations); (B) Electrification of Border Towns; (C) Project Supervision and Management; and (D) Institutional Support to EdD (Electricité de Djibouti) and Ethiopian Electric Power Corporation (EEPCO).

Original sector

Energy

Budget

Location

Country

World

Source

Source

African Development Bank (AfDB)

URL

More Details

Record type

Project

Sector

Manufacturing (Industrial), Commercial, Power Transmission, Power Generation (CCGT), Hydro, Government

Article published date

2025-03-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project