logo

Multinational - Preparation of the Ruzizi Plain Regional Integrated Development Programme (PREDIR)

Sector: Raw Materials • Location: Multinational

Source: African Development Bank (AfDB)

Project

The present project essentially consists in preparatory studies for the elaboration of the Regional Development Program for the Ruzizi Plain (PREDIR). It includes the following components: (i) Elaborating a Master Plan for integrated and sustainable development across the plain in the three countries of the Economic Community of the Great Lakes Countries (ECGLC), which should lead to development g

Project Information FAQ

Project Information

4 Q
The project “Multinational - Preparation of the Ruzizi Plain Regional Integrated Development Programme (PREDIR)” is an infrastructure initiative in the Raw Materials sector, located in Multinational. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The present project essentially consists in preparatory studies for the elaboration of the Regional Development Program for the Ruzizi Plain (PREDIR). It includes the following components: (i) Elaborating a Master Plan for integrated and sustainable development across the plain in the three countries of the Economic Community of the Great Lakes Countries (ECGLC), which should lead to development guidelines for the plain over the next 20 to 30 years, conducting feasibility development studies/Project Summary Note (PSN) over a maximum priority area of 20,000 ha of irrigation perimeter (rehabilitation, creation), elaborating detailed engineering design studies on selected perimeters and preparing tender files; (ii) Conducting a strategic Environmental and Social Assessment (SESA) of all sectors involved in the Master Plan. Once detailed designs are validated through donors round tables in the water and agriculture sectors, it is expected that by the end of the Project the necessary investment funding to achieve the priority civil works for the development of the plain will be raised. The total cost is estimated at EUR 2 024 157, of which EUR 1 969 516 are financed by the FAE, or 97.30%.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data