Multinational - Preparation of the Ruzizi Plain Regional Integrated Development Programme (PREDIR)
One of 4,322 projects Taiyo tracks in Multinational.
Source: African Development Bank (AfDB)
The present project essentially consists in preparatory studies for the elaboration of the Regional Development Program for the Ruzizi Plain (PREDIR). It includes the following components: (i) Elaborating a Master Plan for integrated and sustainable development across the plain in the three countries of the Economic Community of the Great Lakes Countries (ECGLC), which should lead to development g
- Sector
- Water Supply and Storage, Raw Materials, Government
- Location
- World
- Updated
- 22 Jul 2026
- Source
- African Development Bank (AfDB)
ConstructChat
Ask ConstructChat about Multinational - Preparation of the Ruzizi Plain Regional Integrated Development Programme (PREDIR)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The present project essentially consists in preparatory studies for the elaboration of the Regional Development Program for the Ruzizi Plain (PREDIR). It includes the following components: (i) Elaborating a Master Plan for integrated and sustainable development across the plain in the three countries of the Economic Community of the Great Lakes Countries (ECGLC), which should lead to development guidelines for the plain over the next 20 to 30 years, conducting feasibility development studies/Project Summary Note (PSN) over a maximum priority area of 20,000 ha of irrigation perimeter (rehabilitation, creation), elaborating detailed engineering design studies on selected perimeters and preparing tender files; (ii) Conducting a strategic Environmental and Social Assessment (SESA) of all sectors involved in the Master Plan. Once detailed designs are validated through donors round tables in the water and agriculture sectors, it is expected that by the end of the Project the necessary investment funding to achieve the priority civil works for the development of the plain will be raised. The total cost is estimated at EUR 2 024 157, of which EUR 1 969 516 are financed by the FAE, or 97.30%. |
Original sector | Water Supply & Sanitation |
Budget |
Location
Country | World |
Source
Source | African Development Bank (AfDB) |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Raw Materials, Government |
Article published date | 2026-03-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in Multinational
- Multinational - The Interconnection of Electric Grids of Nile Equatorial Lakes Countries (Grant to the Republic of Burundi)
- Multinational - Integrated Programme for Development and Adaptation to Climate Change in the Basin of Niger (PIDACC)
- Multinational- Ruzizi III regional hydropower plant project
- Multinational- Ruzizi III regional hydropower plant project (Rwanda)
- Multinational - Post-Ebola Recovery Social Investment Fund Project (Liberia)
- Cameroon - Transport Facilitation Programme on the Douala – Bangui Corridors
- Multinational - Lake Victoria Water Supply and Sanitation Program - Phase II
- Multinational - Nelson Mandela Institutes - African Institutions of Science and Technology Project
