logo
Project

Multinational - Preparation phase for the Lesotho-Botswana Water Transfer Scheme Study Project

Sector: Water Supply and Storage • Location: Multinational

Source: African Development Bank (AfDB)

The Lesotho Botswana Water Transfer (L-BWT) Project aims to prepare the Lesotho Botswana Water Transfer Project for investment financing. L-BWT is a priority investment project selected for development under the Integrated Water Resources Management Plan of the Orange-Senqu River Basin. The project comprises the development of a dam and water storage reservoir in the Lesotho Lowlands, and a bulk w

Sector
Water Supply and Storage, Power Generation (CCGT), Hydro, Government
Location
World
Updated
22 Jul 2026
Source
African Development Bank (AfDB)

ConstructChat

Ask ConstructChat about Multinational - Preparation phase for the Lesotho-Botswana Water Transfer Scheme Study Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Multinational - Preparation phase for the Lesotho-Botswana Water Transfer Scheme Study Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Multinational. Taiyo aggregates data on it from African Development Bank (AfDB).

Participants

Sponsoring Agency

Status

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Lesotho Botswana Water Transfer (L-BWT) Project aims to prepare the Lesotho Botswana Water Transfer Project for investment financing. L-BWT is a priority investment project selected for development under the Integrated Water Resources Management Plan of the Orange-Senqu River Basin. The project comprises the development of a dam and water storage reservoir in the Lesotho Lowlands, and a bulk water conveyance system from the reservoir, through South Africa to Botswana, over an estimated distance of 712Kms.The project is being developed by the Governments of Lesotho, Botswana and South Africa and aims to provide water to the three countries as well as electricity to compliment the system power needs and that of the local towns in the countries. The combined effect of water delivery and power generation will ensure increased economic viability of the project. The outcomes from the proposed project will ensure water and power security and the optimization of the water resources development, based on balanced economic, social and environmental considerations.

Original sector

Water Supply & Sanitation

Budget

Location

Country

World

Source

Source

African Development Bank (AfDB)

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Power Generation (CCGT), Hydro, Government

Article published date

2025-03-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project