Multinational - Preparation phase for the Lesotho-Botswana Water Transfer Scheme Study Project
Sector: Water Supply and Storage • Location: Multinational
Source: African Development Bank (AfDB)
The Lesotho Botswana Water Transfer (L-BWT) Project aims to prepare the Lesotho Botswana Water Transfer Project for investment financing. L-BWT is a priority investment project selected for development under the Integrated Water Resources Management Plan of the Orange-Senqu River Basin. The project comprises the development of a dam and water storage reservoir in the Lesotho Lowlands, and a bulk w
- Sector
- Water Supply and Storage, Power Generation (CCGT), Hydro, Government
- Location
- World
- Updated
- 22 Jul 2026
- Source
- African Development Bank (AfDB)
ConstructChat
Ask ConstructChat about Multinational - Preparation phase for the Lesotho-Botswana Water Transfer Scheme Study Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Lesotho Botswana Water Transfer (L-BWT) Project aims to prepare the Lesotho Botswana Water Transfer Project for investment financing. L-BWT is a priority investment project selected for development under the Integrated Water Resources Management Plan of the Orange-Senqu River Basin. The project comprises the development of a dam and water storage reservoir in the Lesotho Lowlands, and a bulk water conveyance system from the reservoir, through South Africa to Botswana, over an estimated distance of 712Kms.The project is being developed by the Governments of Lesotho, Botswana and South Africa and aims to provide water to the three countries as well as electricity to compliment the system power needs and that of the local towns in the countries. The combined effect of water delivery and power generation will ensure increased economic viability of the project. The outcomes from the proposed project will ensure water and power security and the optimization of the water resources development, based on balanced economic, social and environmental considerations. |
Original sector | Water Supply & Sanitation |
Budget |
Location
Country | World |
Source
Source | African Development Bank (AfDB) |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Generation (CCGT), Hydro, Government |
Article published date | 2025-03-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in Multinational
- Multinational - The Interconnection of Electric Grids of Nile Equatorial Lakes Countries (Grant to the Republic of Burundi)
- Multinational - Integrated Programme for Development and Adaptation to Climate Change in the Basin of Niger (PIDACC)
- Multinational- Ruzizi III regional hydropower plant project
- Multinational- Ruzizi III regional hydropower plant project (Rwanda)
- Multinational - Post-Ebola Recovery Social Investment Fund Project (Liberia)
- Cameroon - Transport Facilitation Programme on the Douala – Bangui Corridors
- Multinational - Lake Victoria Water Supply and Sanitation Program - Phase II
- Multinational - Nelson Mandela Institutes - African Institutions of Science and Technology Project
