logo

Multinational - Preparation phase for the Lesotho-Botswana Water Transfer Scheme Study Project

Sector: Water Supply and Storage • Location: Multinational

Source: African Development Bank (AfDB)

Project

The Lesotho Botswana Water Transfer (L-BWT) Project aims to prepare the Lesotho Botswana Water Transfer Project for investment financing. L-BWT is a priority investment project selected for development under the Integrated Water Resources Management Plan of the Orange-Senqu River Basin. The project comprises the development of a dam and water storage reservoir in the Lesotho Lowlands, and a bulk w

Project Information FAQ

Project Information

4 Q
The project “Multinational - Preparation phase for the Lesotho-Botswana Water Transfer Scheme Study Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Multinational. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Lesotho Botswana Water Transfer (L-BWT) Project aims to prepare the Lesotho Botswana Water Transfer Project for investment financing. L-BWT is a priority investment project selected for development under the Integrated Water Resources Management Plan of the Orange-Senqu River Basin. The project comprises the development of a dam and water storage reservoir in the Lesotho Lowlands, and a bulk water conveyance system from the reservoir, through South Africa to Botswana, over an estimated distance of 712Kms.The project is being developed by the Governments of Lesotho, Botswana and South Africa and aims to provide water to the three countries as well as electricity to compliment the system power needs and that of the local towns in the countries. The combined effect of water delivery and power generation will ensure increased economic viability of the project. The outcomes from the proposed project will ensure water and power security and the optimization of the water resources development, based on balanced economic, social and environmental considerations.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data