Multinational - Project to Interconnect the Power Grids from the Boali Hydro-Power System - Phase I

The status, timeline and source of this project. A free account opens every field.

Source: African Development Bank (AfDB)

The Project consists of rehabilitating and strengthening Boali 1 (8.75 MW), Boali 2 (20 MW) and Boali 3 (10 MW) hydro-power plants in CAR as well as the Bangui (CAR), Zongo and Libenge (DRC) thermal power plants; build and strengthen the transmission grid with, in particular, a 110 kV line between Bangui and Libenge; rehabilitate and extend the distribution grid including the implementation of co

Sector
Commercial, Water Supply and Storage, Power Generation (CCGT), Hydro, Geothermal, Government, Automotive
Location
World
Updated
22 Jul 2026
Source
African Development Bank (AfDB)

ConstructChat

Ask ConstructChat about Multinational - Project to Interconnect the Power Grids from the Boali Hydro-Power System - Phase I

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Multinational - Project to Interconnect the Power Grids from the Boali Hydro-Power System - Phase I” is an infrastructure initiative in the Commercial sector, located in Multinational. Taiyo aggregates data on it from African Development Bank (AfDB).

Participants

Sponsoring Agency

Status

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Project consists of rehabilitating and strengthening Boali 1 (8.75 MW), Boali 2 (20 MW) and Boali 3 (10 MW) hydro-power plants in CAR as well as the Bangui (CAR), Zongo and Libenge (DRC) thermal power plants; build and strengthen the transmission grid with, in particular, a 110 kV line between Bangui and Libenge; rehabilitate and extend the distribution grid including the implementation of connections. It will be implemented in two phases. This phasing of the project is justified by the need to urgently respond to the calamitous situation regarding electric power generation, transmission and distribution infrastructure in CAR, which no longer meets the needs for basic services such as drinking water supply. The first phase of the project mainly involves the rehabilitation and strengthening of generating units for the transmission and distribution of power. The second phase's major activity will be the construction of the 110 Kv line from Bangui and Libenge. Phase 1 involves the rehabilitation and strengthening of : i) the Boali power system's generating units ; ii) the 110 kV transmission line linking Boali to Bangui currently operated with 63 kV; (iii) the obsolete Bangui, Zongo and Libenge thermal generating plants; (iv) the electrification of CAR localities crossed by the lines, (v) the electrification of Zongo; and (v) building the human and technical capacity of ENERCA. Phase 2 consists of: (i) the construction of the 110/132 kV HV line from Bangui to Libenge and the related substations; and (ii) the electrification of 5 other localities in DRC crossed by this line.

Original sector

Energy

Budget

Location

Country

World

Source

Source

African Development Bank (AfDB)

URL

More Details

Record type

Project

Sector

Commercial, Water Supply and Storage, Power Generation (CCGT), Hydro, Geothermal, Government, Automotive

Article published date

2025-03-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project