logo

Multinational - Rosso Bridge Construction Project

Sector: Commercial • Location: Multinational

Source: African Development Bank (AfDB)

Project

The proposed project is an appropriate response to the lack of a permanent crossing structure between the two banks of the Senegal River, which constitutes the natural border between Senegal and Mauritania, constituting an impediment to the implementation of economic development and regional integration policies. Its design is based on Bank-financed feasibility studies finalized in 2015, which con

Project Information FAQ

Project Information

4 Q
The project “Multinational - Rosso Bridge Construction Project” is an infrastructure initiative in the Commercial sector, located in Multinational. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The proposed project is an appropriate response to the lack of a permanent crossing structure between the two banks of the Senegal River, which constitutes the natural border between Senegal and Mauritania, constituting an impediment to the implementation of economic development and regional integration policies. Its design is based on Bank-financed feasibility studies finalized in 2015, which confirmed the need for this regional integration flagship infrastructure. The construction of a bridge on the Senegal River at Rosso, coupled with the implementation of transport and trade facilitation measures, should lead to: (i) a substantial increase in passenger and goods traffic between the two banks; and (ii) the development of transport activities along the Tangiers-Lagos and Algiers-Dakar trans-African corridors, as well as between Europe and sub-Saharan Africa. The Rosso Bridge will replace the ferry services of the Mauritania Ferry Corporation which currently connects the two banks of the Senegal River, but the services are inefficient due to the low capacity of the ferries and their schedules. The poor crossing conditions slow down the movement of people and goods, leading to high transaction costs which in turn hinder national and regional trade. In addition to its contribution to regional integration, the project will have a significant effect in terms of reducing the extremely high incidence of poverty in the project area in Senegal and Mauritania (respectively 39.5% and 32.2%). The project will facilitate accessibility to the production areas of products as well as the marketing of such products between the two countries and to the outside world. The implementation will run from November 2016 to December 2020. The total project cost, exclusive of taxes and customs duties (ETCD), is estimated at UA 69.89 million.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data