logo
Project

Multinational - Rosso Bridge Construction Project

Sector: Warehouse • Location: Multinational

Source: African Development Bank (AfDB)

The proposed project is an appropriate response to the lack of a permanent crossing structure between the two banks of the Senegal River, which constitutes the natural border between Senegal and Mauritania, constituting an impediment to the implementation of economic development and regional integration policies. Its design is based on Bank-financed feasibility studies finalized in 2015, which con

Sector
Warehouse, Bridge, Mass Transit, Road, Government
Location
World
Updated
22 Jul 2026
Source
African Development Bank (AfDB)

ConstructChat

Ask ConstructChat about Multinational - Rosso Bridge Construction Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Multinational - Rosso Bridge Construction Project” is an infrastructure initiative in the Warehouse sector, located in Multinational. Taiyo aggregates data on it from African Development Bank (AfDB).

Participants

Sponsoring Agency

Status

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The proposed project is an appropriate response to the lack of a permanent crossing structure between the two banks of the Senegal River, which constitutes the natural border between Senegal and Mauritania, constituting an impediment to the implementation of economic development and regional integration policies. Its design is based on Bank-financed feasibility studies finalized in 2015, which confirmed the need for this regional integration flagship infrastructure. The construction of a bridge on the Senegal River at Rosso, coupled with the implementation of transport and trade facilitation measures, should lead to: (i) a substantial increase in passenger and goods traffic between the two banks; and (ii) the development of transport activities along the Tangiers-Lagos and Algiers-Dakar trans-African corridors, as well as between Europe and sub-Saharan Africa. The Rosso Bridge will replace the ferry services of the Mauritania Ferry Corporation which currently connects the two banks of the Senegal River, but the services are inefficient due to the low capacity of the ferries and their schedules. The poor crossing conditions slow down the movement of people and goods, leading to high transaction costs which in turn hinder national and regional trade. In addition to its contribution to regional integration, the project will have a significant effect in terms of reducing the extremely high incidence of poverty in the project area in Senegal and Mauritania (respectively 39.5% and 32.2%). The project will facilitate accessibility to the production areas of products as well as the marketing of such products between the two countries and to the outside world. The implementation will run from November 2016 to December 2020. The total project cost, exclusive of taxes and customs duties (ETCD), is estimated at UA 69.89 million.

Original sector

Transport & Storage

Budget

Location

Country

World

Source

Source

African Development Bank (AfDB)

URL

More Details

Record type

Project

Sector

Warehouse, Bridge, Mass Transit, Road, Government

Article published date

2025-12-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project