Multinational - Ruzizi III regional hydropower plant project (Rwanda)
Sector: Raw Materials • Location: Multinational
Source: African Development Bank (AfDB)
The Ruzizi III Hydropower Plant Project which is part of the Programme for the Development of Infrastructure in Africa (PIDA) concerns Burundi, the Democratic Republic of Congo (DRC) and Rwanda. It entails the construction of a run-of-river dam (on the Ruzizi River between DRC and Rwanda downstream from the Ruzizi II hydropower dam), a 147 MW power plant and a distribution station. Burundi’s curre
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Obfuscated Data |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Ruzizi III Hydropower Plant Project which is part of the Programme for the Development of Infrastructure in Africa (PIDA) concerns Burundi, the Democratic Republic of Congo (DRC) and Rwanda. It entails the construction of a run-of-river dam (on the Ruzizi River between DRC and Rwanda downstream from the Ruzizi II hydropower dam), a 147 MW power plant and a distribution station. Burundi’s current total capacity will double, while Rwanda’s will increase by half. DRC’s share will contribute to raising supply in the Eastern region currently not connected to the interconnected network, while also significantly reducing the percentage of energy of thermal origin. The project will help to meet the needs of the population and of the economy, in general, in accordance with the national development strategies of the countries concerned, which underscore the importance of ensuring reliable and affordable electric power supply to achieve sustainable economic transformation. The specific objectives of this operation are to: (i) contribute to the development of Ruzizi III for hydropower generation; and (ii) strengthen regional economic integration through the creation of an electricity market. The plan is to implement a project at a total cost of UA 443.40 million (of which UA 98.5 million financed by the Bank’s public sector window and UA 35.62 million expected from the private window) over a period of six (6) years, one year of which constitutes the development phase. This is the first regional project designed as a public-private partnership (PPP) aimed at optimizing the hydropower potential of the Ruzizi cascade. For its implementation, a private partner, acting in the capacity of investor/developer, will be recruited and awarded a concession. This partner will be required to develop the project, be a majority partner in a project company (PC) with the three countries concerned and secure the necessary financing. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
