Multinational - Ruzizi III regional hydropower plant project
One of 4,322 projects Taiyo tracks in Multinational.
Source: African Development Bank (AfDB)
The Ruzizi III Hydropower Plant Project which is part of the Programme for the Development of Infrastructure in Africa (PIDA) concerns Burundi, the Democratic Republic of Congo (DRC) and Rwanda. It entails the construction of a run-of-river dam (on the Ruzizi River between DRC and Rwanda downstream from the Ruzizi II hydropower dam), a 147 MW power plant and a distribution station. Burundi’s curre
- Sector
- Raw Materials, Power Transmission, Power Generation (CCGT), Hydro, Geothermal, Water Supply and Storage, Manufacturing (Industrial), Government
- Location
- World
- Updated
- 22 Jul 2026
- Source
- African Development Bank (AfDB)
ConstructChat
Ask ConstructChat about Multinational - Ruzizi III regional hydropower plant project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Ruzizi III Hydropower Plant Project which is part of the Programme for the Development of Infrastructure in Africa (PIDA) concerns Burundi, the Democratic Republic of Congo (DRC) and Rwanda. It entails the construction of a run-of-river dam (on the Ruzizi River between DRC and Rwanda downstream from the Ruzizi II hydropower dam), a 147 MW power plant and a distribution station. Burundi’s current total capacity will double, while Rwanda’s will increase by half. DRC’s share will contribute to raising supply in the Eastern region currently not connected to the interconnected network, while also significantly reducing the percentage of energy of thermal origin. The project will help to meet the needs of the population and of the economy, in general, in accordance with the national development strategies of the countries concerned, which underscore the importance of ensuring reliable and affordable electric power supply to achieve sustainable economic transformation. The specific objectives of this operation are to: (i) contribute to the development of Ruzizi III for hydropower generation; and (ii) strengthen regional economic integration through the creation of an electricity market. The plan is to implement a project at a total cost of UA 443.40 million (of which UA 98.5 million financed by the Bank’s public sector window and UA 35.62 million expected from the private window) over a period of six (6) years, one year of which constitutes the development phase. This is the first regional project designed as a public-private partnership (PPP) aimed at optimizing the hydropower potential of the Ruzizi cascade. For its implementation, a private partner, acting in the capacity of investor/developer, will be recruited and awarded a concession. This partner will be required to develop the project, be a majority partner in a project company (PC) with the three countries concerned and secure the necessary financing. |
Original sector | Energy |
Budget |
Location
Country | World |
Source
Source | African Development Bank (AfDB) |
URL |
More Details
Record type | Project |
Sector | Raw Materials, Power Transmission, Power Generation (CCGT), Hydro, Geothermal, Water Supply and Storage, Manufacturing (Industrial), Government |
Article published date | 2025-03-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Raw Materials projects in Multinational
- Multinational - Integrated Programme for Development and Adaptation to Climate Change in the Basin of Niger (PIDACC)
- Multinational Tanzania/ Rwanda - Feasibility Study of the Isaka-Kigali Railway Project
- Multinational - Sustainable Management of Endemic Ruminant Livestock in West Africa
- Multinational- Ruzizi III regional hydropower plant project (Rwanda)
- Democratic Republic of Congo - Geographically-Integrated ECOMAKALA+ REDD Pilot Project
- PROJET DE GESTION DURABLE DU BETAIL RUMINANT ENDEMIQUE EN AFRIQUE DE L'OUEST(SENEGAL)
- Multinational - Development of forest byproducts and reforestation of degraded areas in central Africa
- Multinational - Sixth Line of Credit to East African Development Bank (EADB)
