Multinational - Ruzizi III regional hydropower plant project
Sector: Manufacturing (Industrial) • Location: Multinational
Source: African Development Bank (AfDB)
The Ruzizi III regional hydroelectric power plant project, which is part of the Programme for Infrastructure Development in Africa (PIDA), involves Burundi, the Democratic Republic of Congo (DRC) and Rwanda. This is the first regional project designed within a public-private partnership (PPP) framework to maximize the hydroelectric potential of the Ruzizi waterfall. The project consists of the con
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Obfuscated Data |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Ruzizi III regional hydroelectric power plant project, which is part of the Programme for Infrastructure Development in Africa (PIDA), involves Burundi, the Democratic Republic of Congo (DRC) and Rwanda. This is the first regional project designed within a public-private partnership (PPP) framework to maximize the hydroelectric potential of the Ruzizi waterfall. The project consists of the construction of a run-of-river dam (located on the Rusizi River between the DRC and Rwanda downstream of the Ruzizi II hydroelectric dam), a 147 MW power plant and a distribution station. Burundi's current total capacity will be doubled and Rwanda's will be increased by half. As for the DRC, its share will make it possible to increase supply in its eastern part, which is not connected to the interconnected grid, while significantly reducing thermal energy. The project will contribute to meeting the needs of people and the economy in general, in accordance with the national development strategies of the countries concerned, which stress the importance of a reliable and affordable supply of electricity for their sustainable socio-economic transformation. The implementation of this project, with a total cost of UA 443.40 million (including UA 98.5 million financed by the Bank's public window and 35.62 expected from the private window), is planned over a six (06) year period. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
