Multinational - Ruzizi III regional hydropower plant project
Sector: Manufacturing (Industrial) • Location: Multinational
Source: African Development Bank (AfDB)
The Ruzizi III regional hydroelectric power plant project, which is part of the Programme for Infrastructure Development in Africa (PIDA), involves Burundi, the Democratic Republic of Congo (DRC) and Rwanda. This is the first regional project designed within a public-private partnership (PPP) framework to maximize the hydroelectric potential of the Ruzizi waterfall. The project consists of the con
- Sector
- Manufacturing (Industrial), Power Transmission, Power Generation (CCGT), Hydro, Geothermal, Water Supply and Storage, Government
- Location
- World
- Updated
- 22 Jul 2026
- Source
- African Development Bank (AfDB)
ConstructChat
Ask ConstructChat about Multinational - Ruzizi III regional hydropower plant project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Ruzizi III regional hydroelectric power plant project, which is part of the Programme for Infrastructure Development in Africa (PIDA), involves Burundi, the Democratic Republic of Congo (DRC) and Rwanda. This is the first regional project designed within a public-private partnership (PPP) framework to maximize the hydroelectric potential of the Ruzizi waterfall. The project consists of the construction of a run-of-river dam (located on the Rusizi River between the DRC and Rwanda downstream of the Ruzizi II hydroelectric dam), a 147 MW power plant and a distribution station. Burundi's current total capacity will be doubled and Rwanda's will be increased by half. As for the DRC, its share will make it possible to increase supply in its eastern part, which is not connected to the interconnected grid, while significantly reducing thermal energy. The project will contribute to meeting the needs of people and the economy in general, in accordance with the national development strategies of the countries concerned, which stress the importance of a reliable and affordable supply of electricity for their sustainable socio-economic transformation. The implementation of this project, with a total cost of UA 443.40 million (including UA 98.5 million financed by the Bank's public window and 35.62 expected from the private window), is planned over a six (06) year period. |
Original sector | Energy |
Budget |
Location
Country | World |
Source
Source | African Development Bank (AfDB) |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Power Transmission, Power Generation (CCGT), Hydro, Geothermal, Water Supply and Storage, Government |
Article published date | 2025-03-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in Multinational
- Multinational - Road Development and Transport Facilitation Programme within the Mano River Union (Additional Loan – Côte d’Ivoire)
- Multinational - The Interconnection of Electric Grids of Nile Equatorial Lakes Countries (Grant to the Republic of Burundi)
- Multinational Tanzania/ Rwanda - Feasibility Study of the Isaka-Kigali Railway Project
- Multinational- Ruzizi III regional hydropower plant project
- Multinational - Scaling-up the Clean Cooking Industry in Africa
- Multinational- Ruzizi III regional hydropower plant project (Rwanda)
- Multinational - Crisis Response – Technical Assistance to Support Countries (Guinea, Sierra Leone and Liberia) Most Affected with Ebola Epidemic Project
- Democratic Republic of Congo - Geographically-Integrated ECOMAKALA+ REDD Pilot Project
