logo

Multinational - Ruzizi III regional hydropower plant project

Sector: Manufacturing (Industrial) • Location: Multinational

Source: African Development Bank (AfDB)

Project

The Ruzizi III regional hydroelectric power plant project, which is part of the Programme for Infrastructure Development in Africa (PIDA), involves Burundi, the Democratic Republic of Congo (DRC) and Rwanda. This is the first regional project designed within a public-private partnership (PPP) framework to maximize the hydroelectric potential of the Ruzizi waterfall. The project consists of the con

Project Information FAQ

Project Information

4 Q
The project “Multinational - Ruzizi III regional hydropower plant project” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in Multinational. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Ruzizi III regional hydroelectric power plant project, which is part of the Programme for Infrastructure Development in Africa (PIDA), involves Burundi, the Democratic Republic of Congo (DRC) and Rwanda. This is the first regional project designed within a public-private partnership (PPP) framework to maximize the hydroelectric potential of the Ruzizi waterfall. The project consists of the construction of a run-of-river dam (located on the Rusizi River between the DRC and Rwanda downstream of the Ruzizi II hydroelectric dam), a 147 MW power plant and a distribution station. Burundi's current total capacity will be doubled and Rwanda's will be increased by half. As for the DRC, its share will make it possible to increase supply in its eastern part, which is not connected to the interconnected grid, while significantly reducing thermal energy. The project will contribute to meeting the needs of people and the economy in general, in accordance with the national development strategies of the countries concerned, which stress the importance of a reliable and affordable supply of electricity for their sustainable socio-economic transformation. The implementation of this project, with a total cost of UA 443.40 million (including UA 98.5 million financed by the Bank's public window and 35.62 expected from the private window), is planned over a six (06) year period.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data