logo
Project

Multinational - Ruzizi III regional hydropower plant project

Sector: Manufacturing (Industrial) • Location: Multinational

Source: African Development Bank (AfDB)

The Ruzizi III regional hydroelectric power plant project, which is part of the Programme for Infrastructure Development in Africa (PIDA), involves Burundi, the Democratic Republic of Congo (DRC) and Rwanda. This is the first regional project designed within a public-private partnership (PPP) framework to maximize the hydroelectric potential of the Ruzizi waterfall. The project consists of the con

Sector
Manufacturing (Industrial), Power Transmission, Power Generation (CCGT), Hydro, Geothermal, Water Supply and Storage, Government
Location
World
Updated
22 Jul 2026
Source
African Development Bank (AfDB)

ConstructChat

Ask ConstructChat about Multinational - Ruzizi III regional hydropower plant project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Multinational - Ruzizi III regional hydropower plant project” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in Multinational. Taiyo aggregates data on it from African Development Bank (AfDB).

Participants

Sponsoring Agency

Status

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Ruzizi III regional hydroelectric power plant project, which is part of the Programme for Infrastructure Development in Africa (PIDA), involves Burundi, the Democratic Republic of Congo (DRC) and Rwanda. This is the first regional project designed within a public-private partnership (PPP) framework to maximize the hydroelectric potential of the Ruzizi waterfall. The project consists of the construction of a run-of-river dam (located on the Rusizi River between the DRC and Rwanda downstream of the Ruzizi II hydroelectric dam), a 147 MW power plant and a distribution station. Burundi's current total capacity will be doubled and Rwanda's will be increased by half. As for the DRC, its share will make it possible to increase supply in its eastern part, which is not connected to the interconnected grid, while significantly reducing thermal energy. The project will contribute to meeting the needs of people and the economy in general, in accordance with the national development strategies of the countries concerned, which stress the importance of a reliable and affordable supply of electricity for their sustainable socio-economic transformation. The implementation of this project, with a total cost of UA 443.40 million (including UA 98.5 million financed by the Bank's public window and 35.62 expected from the private window), is planned over a six (06) year period.

Original sector

Energy

Budget

Location

Country

World

Source

Source

African Development Bank (AfDB)

URL

More Details

Record type

Project

Sector

Manufacturing (Industrial), Power Transmission, Power Generation (CCGT), Hydro, Geothermal, Water Supply and Storage, Government

Article published date

2025-03-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project