logo

Multinational - Songwe River Basin Development Programme (SRBDP)

Sector: Raw Materials • Location: Multinational

Source: African Development Bank (AfDB)

Project

Governments of Tanzania and Malawi received a €4 million grant to support the investment preparation for the development of Songwe River Basin. The goal of the project is to contribute to improved living conditions of basin population and socio-economic development in the two countries. The specific objectives are to prepare designs and joint investment projects for implementation and create an ef

Project Information FAQ

Project Information

4 Q
The project “Multinational - Songwe River Basin Development Programme (SRBDP)” is an infrastructure initiative in the Raw Materials sector, located in Multinational. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Governments of Tanzania and Malawi received a €4 million grant to support the investment preparation for the development of Songwe River Basin. The goal of the project is to contribute to improved living conditions of basin population and socio-economic development in the two countries. The specific objectives are to prepare designs and joint investment projects for implementation and create an effective enabling environment for transboundary water resources management (TWRM) in the Songwe River Basin.The Project also provides detailed designs and other preparations for capital investments including a multi-purpose dams, and associated hydropower schemes, irrigated agriculture, river stabilization, flood control, fisheries development, water supply and roads. Two other dams in the river basin will be designed to feasibility level under this study and their detailed designs will be undertaken later on, under the implementation of the Songwe River Basin Development Programme (SRBDP).

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data