Multinational - Studies on Tariffs for Water Withdrawals from the Senegal River and the Rehabilitation of the Hydraulic Network of the Senegal River Basin
Sector: Raw Materials • Location: Multinational
Source: African Development Bank (AfDB)
The conduct of the two studies will enable OMVS and the member countries to lay the sustainable foundations of a strategy for the maintenance and upkeep of the infrastructure downstream from Diama and the waterways dependent on the Senegal River. These two studies will provide the country with tariff and planning instruments capable of ensuring the promotion of social and economic activities relat
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Obfuscated Data |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The conduct of the two studies will enable OMVS and the member countries to lay the sustainable foundations of a strategy for the maintenance and upkeep of the infrastructure downstream from Diama and the waterways dependent on the Senegal River. These two studies will provide the country with tariff and planning instruments capable of ensuring the promotion of social and economic activities related to the development of the Senegal River. The Tariff Study will be conducted in two phases over an 8-month period and will comprise a number of key activities including the calculation of the cost price of water and an analysis of the maintenance function of SOGED. It will prepare in detail a reliable tariff and recovery system, easy to implement. The new tariff system stemming from the study must aim to achieve a much greater contribution of all the economic operators benefiting from the impact of the regulation of the river. The rehabilitation study will also be conducted in two phases, but over an 11-month period. It is in keeping with a preparatory phase, which will make it possible to carry out a complete inventory, to be used as a vital frame of reference for the entire integrated control programme, and which will lead to the definition of a number of concrete priority operations to be carried out which can be integrated in a cohesive, Senegal River-wide strategy. The total cost of the two studies is estimated at CFA.F 739 million, i.e. UA 0.81 million. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
