Multinational - Study on the Cameroon-Chad Electricity Interconnection Project
Sector: Commercial • Location: Multinational
Source: African Development Bank (AfDB)
The Cameroon-Chad interconnection study stems from the desire of both countries to optimize the use of their energy resources by integrating their electricity generation, transmission and distribution infrastructure. Indeed, Cameroon and Chad face major economic and social development difficulties resulting from various constraints, which include: (i) the small size of their domestic markets; (ii)
- Sector
- Commercial, Power Generation (CCGT), Government
- Location
- World
- Updated
- 22 Jul 2026
- Source
- African Development Bank (AfDB)
ConstructChat
Ask ConstructChat about Multinational - Study on the Cameroon-Chad Electricity Interconnection Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Cameroon-Chad interconnection study stems from the desire of both countries to optimize the use of their energy resources by integrating their electricity generation, transmission and distribution infrastructure. Indeed, Cameroon and Chad face major economic and social development difficulties resulting from various constraints, which include: (i) the small size of their domestic markets; (ii) poor economic diversification; and (iii) structural deficits and exorbitant energy costs. The Cameroon-Chad interconnection line is recognized within the power exchange scheme of the member-states of the Economic Community of Central African States (ECCAS) as part of the key power exchange infrastructure envisaged for this area. This study is an appropriate response to the electricity supply constraints and difficulties faced by the two countries. Indeed, implementation of the project that will result from this study will raise the electricity access rate which is low in both countries. It will also make it possible to increase power exchange between Cameroon and Chad. The study thus has two components: one involving interconnection of the power grids of Cameroon and Chad, and the other, rural electrification along the corridors of the transmission lines. It will be conducted in two main phases, namely: (i) a preliminary study, and (ii) an enhanced preliminary design study that sets out the main tasks required at the final design stage. With an estimated cost of UA 3.060 million net of taxes, it will be implemented over a 20-month period from January 2014. |
Original sector | Energy |
Budget |
Location
Country | World |
Source
Source | African Development Bank (AfDB) |
URL |
More Details
Record type | Project |
Sector | Commercial, Power Generation (CCGT), Government |
Article published date | 2025-03-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in Multinational
- Multinational - The Interconnection of Electric Grids of Nile Equatorial Lakes Countries (Grant to the Republic of Burundi)
- Multinational - Integrated Programme for Development and Adaptation to Climate Change in the Basin of Niger (PIDACC)
- Multinational - Scaling-up the Clean Cooking Industry in Africa
- Multinational - Study on the Abidjan - Lagos Highway Corridor Development Project -
- Multinational - Post-Ebola Recovery Social Investment Fund Project (Liberia)
- Multinational - Lake Victoria Water Supply and Sanitation Program - Phase II
- Multinational - Study into the contribution of the Jewelry Manufacturing and its Impact on Value Addition, Job Creation, and the Economic Empowerment of Women and Youth
- Multinational - Support to the control of communicable diseases such as HIV/AIDS, Tuberculose, Malaria.
