logo

Multinational - Study on the Ouesso-Bangui-N’Djamena Road and Inland Navigation on the Congo, Oubangui and Sangha Rivers

Sector: Road • Location: Multinational

Source: African Development Bank (AfDB)

Project

The proposed Study will contribute at sectoral level to the strengthening of regional integration through the establishment of inter-state links within the Economic Community of Central African States (ECCAS). Specifically, it aims to determine the technical, environmental and economic feasibility of developing the missing links of the N'djamena-Bangui-Pointe Noire or Matadi corridors by road and/

Project Information FAQ

Project Information

4 Q
The project “Multinational - Study on the Ouesso-Bangui-N’Djamena Road and Inland Navigation on the Congo, Oubangui and Sangha Rivers” is an infrastructure initiative in the Road sector, located in Multinational. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The proposed Study will contribute at sectoral level to the strengthening of regional integration through the establishment of inter-state links within the Economic Community of Central African States (ECCAS). Specifically, it aims to determine the technical, environmental and economic feasibility of developing the missing links of the N'djamena-Bangui-Pointe Noire or Matadi corridors by road and/or river (through navigation on the Congo, Oubangui and Sangha rivers). The Study comprises two components (study and study management), for a total cost of UA 8.60 million, including UA 8.00 million from the ADF. The study component is subdivided into two components (road and navigation) and each will be the subject of full studies. Execution will run from January 2011 to June 2013 and will be carried out by ECCAS under the authority delegated to it by Congo, CAR, DRC and Chad.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data