The proposed operation aims to provide a supplementary financing of EURO 26.51million of ADB loan to the Republic of Kenya to finance the funding gap of the Ethiopia-Kenya Electricity Highway project. The supplementary loan for Kenya will contribute to the integration of the ongoing interconnection project and the reliable operation of the Kenyan grid through construction of 400/220 kV Mariakani s

Project Information FAQ

Project Information

4 Q
The project “Multinational - Supplementary Financing for Kenya under the Ethiopia-Kenya Electricity Highway Project” is an infrastructure initiative in the Road sector, located in Multinational. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The proposed operation aims to provide a supplementary financing of EURO 26.51million of ADB loan to the Republic of Kenya to finance the funding gap of the Ethiopia-Kenya Electricity Highway project. The supplementary loan for Kenya will contribute to the integration of the ongoing interconnection project and the reliable operation of the Kenyan grid through construction of 400/220 kV Mariakani substation and the 16.5 km length of 132 kV underground cable to interconnect the Nanyuki and Rumuruti substations. The need for additional reinforcement is due to the underestimation made on the feasibility study on power demand growth, increase of electrification rate and generation capacity, which has resulted in cost overrun of the initial project cost estimates. The revised design to reinforce the Kenyan power transmission network without reducing/downsizing the initial scope of the interconnector and the component of system reinforcement is through construction of: the 400/220 kV Mariakani substation to improve the power transfer capacity, adequacy and security to the Coastal Region; and (ii) the 16.5 km, 132 kV underground cable to interconnects the Nanyuki and Rumuruti substations that addresses the safety and security issues of Laikipia Airbase.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data