Multinational - Temane Transmission Project (TTP)
Sector: Raw Materials • Location: Multinational
Source: African Development Bank (AfDB)
The Temane Transmission Project (TTP) consists of a 563-km, 400-kV single-circuit HVAC (High Voltage Alternating Current) transmission line between Vilanculos Chibuto-Matalane-Maputo, associated with three new 400-kV substations at Vilanculos, Chibuto and Matalane, and expansion of the existing Maputo substation. The project will allow for the evacuation of 400 MW from the envisaged Central Termic
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Obfuscated Data |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Temane Transmission Project (TTP) consists of a 563-km, 400-kV single-circuit HVAC (High Voltage Alternating Current) transmission line between Vilanculos Chibuto-Matalane-Maputo, associated with three new 400-kV substations at Vilanculos, Chibuto and Matalane, and expansion of the existing Maputo substation. The project will allow for the evacuation of 400 MW from the envisaged Central Termica Temane (CTT) project, which will reinforce generation capacity in the country and in the region via the utilization of Mozambique’s endogenous gas resources. The project is also expected to have significant positive economic impacts along the route, unleashing industrial developments that are currently constrained by lack of a reliable power supply solution in the geographic area covered. The TTP will also allow security and reliability of electricity supply and the establishment of economic development zones along the envisaged T-line route. In these areas, it will contribute to unlock the agricultural potential of rural areas and the creation of higher value jobs. The main components of the project are: (a) substations; (b) transmission lines; (c) financing costs; and (d) other costs. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Raw Materials projects in Multinational
- Multinational - Desert to Power Initiative West Africa Regional Energy Program – Phase I
- Multinational - Post Cyclone Idai and Kenneth Emergency Recovery and Resilience Programme (PCIREP) – Mozambique
- Multinational (Cameroon - Nigeria) - Transport Facilitation Program Corridor - Bamenda-Enugu- (PAGODA Supplemental Grant)
- Multinational - Bissau - Dakar Road Corridor Improvement Project - Phase 1 - Farim-Tanaff-Sandinieri Road Development
- Multinational - Road Development and Transport Facilitation Programme within the Mano River Union (Additional Loan - Guinea)
- Multinational- Ruzizi III regional hydropower plant project (Burundi)
- Multinational - Valorization of African Medicinal Plant for Mainstreaming Entrepreneurship and Environment
- Multinational (Mauritania-Senegal) - Studies of an economic corridor between Nouadhibou - Nouakchott - Rosso - Dakar
