Multinational - The African Programme for Onchocerciasis Control (Phase II and Phasing out)
The status, timeline and source of this project. A free account opens every field.
Source: African Development Bank (AfDB)
The African Program for Onchocerciasis Control (APOC) was established in 1996 in 19 countries (Liberia, Nigeria, Burundi, Cameroon, Central African Republic, Republic of Congo, Democratic Republic of Congo (DRC), Gabon, Equatorial Guinea, Angola, Chad, Ethiopia, Uganda, Tanzania, Sudan, Malawi, Kenya, Rwanda, and Mozambique) where onchocerciasis is still found. Phase I lasted from 1995 to 2001 and
- Sector
- Government
- Location
- World
- Updated
- 22 Jul 2026
- Source
- African Development Bank (AfDB)
ConstructChat
Ask ConstructChat about Multinational - The African Programme for Onchocerciasis Control (Phase II and Phasing out)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The African Program for Onchocerciasis Control (APOC) was established in 1996 in 19 countries (Liberia, Nigeria, Burundi, Cameroon, Central African Republic, Republic of Congo, Democratic Republic of Congo (DRC), Gabon, Equatorial Guinea, Angola, Chad, Ethiopia, Uganda, Tanzania, Sudan, Malawi, Kenya, Rwanda, and Mozambique) where onchocerciasis is still found. Phase I lasted from 1995 to 2001 and Phase II, the subject of this support, was expected to last from 2002 to 2010. However, in December 2007, the latter, which corresponds to the phasing out and exit of APOC, was extended to 2015 to take into account program phasing out activities and the need to strengthen onchocerciasis control in post-conflict countries. To that end, the program adopted an action plan (2008 – 2015) to implement this decision. The program’s strategy is based on community-directed treatment with ivermectin (CDTI). One of the objectives of the 2008 – 2015 action plan is to consolidate the outcomes already achieved by APOC, and to complete the work in post-conflict areas. The expected benefits are the protection of 98 700 000 people at risk against onchocerciasis within the APOC coverage area and self management by 117 000 communities within the APOC area of the community-directed Ivermectin treatment. The total cost of this Phase II and phasing-out of the program, excluding taxes and customs duty, stands at UA 74.70 million. |
Original sector | Health |
Budget |
Location
Country | World |
Source
Source | African Development Bank (AfDB) |
URL |
More Details
Record type | Project |
Sector | Government |
Article published date | 2025-12-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Government projects in Multinational
- Multinational - Road Development and Transport Facilitation Programme within the Mano River Union (Additional Loan – Côte d’Ivoire)
- Multinational - The Interconnection of Electric Grids of Nile Equatorial Lakes Countries (Grant to the Republic of Burundi)
- Ghana - Togo - Benin Power Interconnect
- Multinational - Integrated Programme for Development and Adaptation to Climate Change in the Basin of Niger (PIDACC)
- Multinational Tanzania/ Rwanda - Feasibility Study of the Isaka-Kigali Railway Project
- Multinational - Sustainable Management of Endemic Ruminant Livestock in West Africa
- Multinational- Ruzizi III regional hydropower plant project
- Multinational - Scaling-up the Clean Cooking Industry in Africa
