logo
Project

Multinational - The Bugesera Integrated Rural Development Project (A PPF to Rwanda)

Sector: Raw Materials • Location: Rwanda

Source: African Development Bank (AfDB)

The present intervention relates to the preparation of the Bugesera Integrated Rural Development Project (a PPF to Rwanda). It's initiated because of the need, in order to guarantee good quality for the project at entry, to prepare the final designs of the marshland development works and conduct a feasibility study on the development of the areas to be irrigated from cross-border lakes during the

Sector
Raw Materials, Water Supply and Storage, Government
Location
Rwanda
Updated
22 Jul 2026
Source
African Development Bank (AfDB)

ConstructChat

Ask ConstructChat about Multinational - The Bugesera Integrated Rural Development Project (A PPF to Rwanda)

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Multinational - The Bugesera Integrated Rural Development Project (A PPF to Rwanda)” is an infrastructure initiative in the Raw Materials sector, located in Rwanda. Taiyo aggregates data on it from African Development Bank (AfDB).

Participants

Sponsoring Agency

Status

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The present intervention relates to the preparation of the Bugesera Integrated Rural Development Project (a PPF to Rwanda). It's initiated because of the need, in order to guarantee good quality for the project at entry, to prepare the final designs of the marshland development works and conduct a feasibility study on the development of the areas to be irrigated from cross-border lakes during the project preparation process. The studies should, during project appraisal, provide good cost estimates of the scheduled works. The marshland development studies should include an environmental and social impact assessment. More specifically, this intervention should ultimately allow: (i) preparing the final designs for the development of marshlands in the two countries and evaluating the cost of the works; (ii) conducting an evaluation of the economic rate of return of these developments, as well as an environmental and social impact assessment; (iii) proposing technical solutions for the development of lake water irrigation in the project area.

Original sector

Other Multisector

Budget

Location

Country

Rwanda

Source

Source

African Development Bank (AfDB)

URL

More Details

Record type

Project

Sector

Raw Materials, Water Supply and Storage, Government

Article published date

2025-03-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project