Multinational - The Bugesera Integrated Rural Development Project (A PPF to Rwanda)
Sector: Raw Materials • Location: Rwanda
Source: African Development Bank (AfDB)
The present intervention relates to the preparation of the Bugesera Integrated Rural Development Project (a PPF to Rwanda). It's initiated because of the need, in order to guarantee good quality for the project at entry, to prepare the final designs of the marshland development works and conduct a feasibility study on the development of the areas to be irrigated from cross-border lakes during the
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Obfuscated Data |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The present intervention relates to the preparation of the Bugesera Integrated Rural Development Project (a PPF to Rwanda). It's initiated because of the need, in order to guarantee good quality for the project at entry, to prepare the final designs of the marshland development works and conduct a feasibility study on the development of the areas to be irrigated from cross-border lakes during the project preparation process. The studies should, during project appraisal, provide good cost estimates of the scheduled works. The marshland development studies should include an environmental and social impact assessment. More specifically, this intervention should ultimately allow: (i) preparing the final designs for the development of marshlands in the two countries and evaluating the cost of the works; (ii) conducting an evaluation of the economic rate of return of these developments, as well as an environmental and social impact assessment; (iii) proposing technical solutions for the development of lake water irrigation in the project area. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Raw Materials projects in Rwanda
- ELECTRICITY ACCESS RWANDA
- Rwanda - National Rural Drinking Water Supply and Sanitation Program (Phase II)
- Kigali Bulk Water Supply Project
- Symbion Power Lake Kivu Limited
- Rwanda - Feasibility study for a lime and/or crushed travertine production project
- Rwanda - Emergency humanitarian aid for flood victims
- RWANDA - Green Investment Facility (RGIF) Program
- Rwanda - Regional Pharmaceutical Sector Support Project (RPSSP)
