Multinational - The Bugesera Integrated Rural Development Project (A PPF to Rwanda)
Sector: Raw Materials • Location: Rwanda
Source: African Development Bank (AfDB)
The present intervention relates to the preparation of the Bugesera Integrated Rural Development Project (a PPF to Rwanda). It's initiated because of the need, in order to guarantee good quality for the project at entry, to prepare the final designs of the marshland development works and conduct a feasibility study on the development of the areas to be irrigated from cross-border lakes during the
- Sector
- Raw Materials, Water Supply and Storage, Government
- Location
- Rwanda
- Updated
- 22 Jul 2026
- Source
- African Development Bank (AfDB)
ConstructChat
Ask ConstructChat about Multinational - The Bugesera Integrated Rural Development Project (A PPF to Rwanda)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The present intervention relates to the preparation of the Bugesera Integrated Rural Development Project (a PPF to Rwanda). It's initiated because of the need, in order to guarantee good quality for the project at entry, to prepare the final designs of the marshland development works and conduct a feasibility study on the development of the areas to be irrigated from cross-border lakes during the project preparation process. The studies should, during project appraisal, provide good cost estimates of the scheduled works. The marshland development studies should include an environmental and social impact assessment. More specifically, this intervention should ultimately allow: (i) preparing the final designs for the development of marshlands in the two countries and evaluating the cost of the works; (ii) conducting an evaluation of the economic rate of return of these developments, as well as an environmental and social impact assessment; (iii) proposing technical solutions for the development of lake water irrigation in the project area. |
Original sector | Other Multisector |
Budget |
Location
Country | Rwanda |
Source
Source | African Development Bank (AfDB) |
URL |
More Details
Record type | Project |
Sector | Raw Materials, Water Supply and Storage, Government |
Article published date | 2025-03-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Raw Materials projects in Rwanda
- Rwanda - National Rural Drinking Water Supply and Sanitation Program (Phase II)
- Kigali Bulk Water Supply Project
- Symbion Power Lake Kivu Limited
- ELECTRICITY ACCESS RWANDA
- GREEN AGRICULTURE VALUE CHAIN - BANK OF KIGALI
- Rwanda - Feasibility study for a lime and/or crushed travertine production project
- Rwanda - Emergency humanitarian aid for flood victims
- RWANDA - Green Investment Facility (RGIF) Program
