Multinational - The Interconnection of Electric Grids of Nile Equatorial Lakes Countries (Grant to NBI)

Sector: Manufacturing (Industrial) • Location: Multinational

Source: African Development Bank (AfDB)

Project

The project consists in the construction and upgrading of 769 km of 220 kV and 110 kV power lines and 17 transformer stations to interconnect the electric grids of the following Nile Equatorial Lakes (NBI) countries: Burundi, Kenya, Uganda, DR Congo and Rwanda. The project has three (3) components: (i) the Uganda-Rwanda interconnection: the line runs from Mbarara station to Mirama station in Ugand

Project Information FAQ

Project Information

4 Q
The project “Multinational - The Interconnection of Electric Grids of Nile Equatorial Lakes Countries (Grant to NBI)” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in Multinational. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project consists in the construction and upgrading of 769 km of 220 kV and 110 kV power lines and 17 transformer stations to interconnect the electric grids of the following Nile Equatorial Lakes (NBI) countries: Burundi, Kenya, Uganda, DR Congo and Rwanda. The project has three (3) components: (i) the Uganda-Rwanda interconnection: the line runs from Mbarara station to Mirama station in Uganda, then from Mirama station to the new Birembo station in Rwanda; (ii) the Kenya-Uganda interconnection: the line runs from Lessos station in Kenya to Bujagali station passing through Tororo station in Uganda; and (iii) upgrading of the Burundi, DR Congo and Rwanda interconnection. This component consists in upgrading the current line from Goma station to the Rusizi I station in DR Congo from 70 kV to 220 kV, and the line from Rusizi 1 station to Bujumbura in Burundi from 70 kV to 110 kV, as well as the construction of an extension from Bujumbura to Kiliba in DR Congo and the construction of a 110 kV line from Kibuye station to Gisenyi station in Rwanda; and lastly, the construction of the line from Gisenyi station in Rwanda to Goma station in DR Congo. The project also provides for building of the operating and maintenance technical capacities of the said networks. The total estimated cost is UA 160.20 million. It will be implemented within a period of 48 months starting from 2009.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data