Multinational - The Interconnection of Electric Grids of Nile Equatorial Lakes Countries
Sector: Manufacturing (Industrial) • Location: Multinational
Source: African Development Bank (AfDB)
The Nile Equatorial Lakes (NEL) Countries Electric Grids Interconnection Project lays the necessary groundwork for the creation of a regional electricity market that would include not only the NBI development programme but also those of the East African Energy Pool (EAPP). The regionalization of electricity production was confirmed by the options development study as the least costly solution to m
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Obfuscated Data |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Nile Equatorial Lakes (NEL) Countries Electric Grids Interconnection Project lays the necessary groundwork for the creation of a regional electricity market that would include not only the NBI development programme but also those of the East African Energy Pool (EAPP). The regionalization of electricity production was confirmed by the options development study as the least costly solution to meet the electric energy demand of these countries. As indicated in the Nile Basin Initiative (NBI) strategic action plan, the project consists in the construction and upgrading of 769 km of 110 kV and 220 kV line, as well as the construction and reinforcement of 17 transformer stations. It consists of: (i) the Uganda-Rwanda interconnection: the line runs from Mbarara station to Mirama station in Uganda, then from Mirama station to the new Birembo station in Rwanda; (ii) the Kenya-Uganda interconnection: the line runs from Lessos station in Kenya to Bujagali station passing through Tororo station in Uganda; and (iii) upgrading of the Burundi, DR Congo and Rwanda interconnection. By interconnecting the grids of the five (5) countries (Burundi, Kenya, Uganda, DR Congo and Rwanda), the project will contribute to the implementation of this regional strategy. It will also supplement ongoing energy transmission projects as well as those planned for the future in the region, namely: the development in Ethiopia of Gibe III (1800 MW), the interconnection between Ethiopia and Djibouti, the interconnection between Ethiopia and Sudan, as well as the interconnection between Ethiopia and Kenya. The total estimated cost of the project is UA 160.20 million. It will be implemented within a period of 48 months starting from 2009. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
