Multinational - The Interconnection of Electric Grids of Nile Equatorial Lakes Countries

Sector: Manufacturing (Industrial) • Location: Multinational

Source: African Development Bank (AfDB)

Project

The Nile Equatorial Lakes (NEL) Countries Electric Grids Interconnection Project lays the necessary groundwork for the creation of a regional electricity market that would include not only the NBI development programme but also those of the East African Energy Pool (EAPP). The regionalization of electricity production was confirmed by the options development study as the least costly solution to m

Project Information FAQ

Project Information

4 Q
The project “Multinational - The Interconnection of Electric Grids of Nile Equatorial Lakes Countries” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in Multinational. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Nile Equatorial Lakes (NEL) Countries Electric Grids Interconnection Project lays the necessary groundwork for the creation of a regional electricity market that would include not only the NBI development programme but also those of the East African Energy Pool (EAPP). The regionalization of electricity production was confirmed by the options development study as the least costly solution to meet the electric energy demand of these countries. As indicated in the Nile Basin Initiative (NBI) strategic action plan, the project consists in the construction and upgrading of 769 km of 110 kV and 220 kV line, as well as the construction and reinforcement of 17 transformer stations. It consists of: (i) the Uganda-Rwanda interconnection: the line runs from Mbarara station to Mirama station in Uganda, then from Mirama station to the new Birembo station in Rwanda; (ii) the Kenya-Uganda interconnection: the line runs from Lessos station in Kenya to Bujagali station passing through Tororo station in Uganda; and (iii) upgrading of the Burundi, DR Congo and Rwanda interconnection. By interconnecting the grids of the five (5) countries (Burundi, Kenya, Uganda, DR Congo and Rwanda), the project will contribute to the implementation of this regional strategy. It will also supplement ongoing energy transmission projects as well as those planned for the future in the region, namely: the development in Ethiopia of Gibe III (1800 MW), the interconnection between Ethiopia and Djibouti, the interconnection between Ethiopia and Sudan, as well as the interconnection between Ethiopia and Kenya. The total estimated cost of the project is UA 160.20 million. It will be implemented within a period of 48 months starting from 2009.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data