logo

Multinational - The Kolwezi (DRC)-Solwezi (Zambia) 330 kV Power Interconnector Project

Sector: Commercial • Location: Multinational

Source: African Development Bank (AfDB)

Project

The present operation concerns the feasibility study of the Kolwezi -Solwezi Power Interconnector Project which directly supports the African Union’s Programme for Infrastructure Development in Africa (PIDA), especially North-South Power Transmission Corridor. The Kolwezi–Solwezi interconnection will contribute enormously to the stability of both the Zambia Electricity Supply Corporation Limited (

Project Information FAQ

Project Information

4 Q
The project “Multinational - The Kolwezi (DRC)-Solwezi (Zambia) 330 kV Power Interconnector Project” is an infrastructure initiative in the Commercial sector, located in Multinational. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The present operation concerns the feasibility study of the Kolwezi -Solwezi Power Interconnector Project which directly supports the African Union’s Programme for Infrastructure Development in Africa (PIDA), especially North-South Power Transmission Corridor. The Kolwezi–Solwezi interconnection will contribute enormously to the stability of both the Zambia Electricity Supply Corporation Limited (ZESCO) and National Electricity Company (SNEL) networks, especially in the southern part of DRC. It will support SNEL's network in the Katanga area, and will also provide additional transmission capacity for exports from Zambia and other SAPP (Southern African Power Pool) member countries to DRC, and conversely. The NEPAD-IPPF grants are to help fund full feasibility studies, including detailed design and tender documents of the proposed high-voltage direct current (HVDC) 330-/400-kV transmission lines within two years. This support includes one component consisting of the following sub components: (i) Feasibility Study, Detailed Design, Tender Documents and Terms of References for supervision consultant; (ii) Environmental and Social Impact Assessment (ESIA); and (iii) Resettlement Action Plan (RAP).

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data