Multinational - Trans-Sahara Optical Fibre Backbone Project
Sector: Broadband • Location: Multinational
Source: African Development Bank (AfDB)
The multinational component of the Trans-Sahara Optical Fibre Backbone (TSB) Project aims to achieve the interconnection between Niger, Algeria, Nigeria and Chad through the laying of 1 510 kilometres of optical fibre cables. The project is a natural extension of the Trans-Saharan Highway (RTS). It has been attached to the Trans-Saharan Highway project to connect all concentrations of people on it
- Sector
- Broadband, Power Generation (CCGT), Telecommunications, Education, Solar, Road, Government
- Location
- World
- Updated
- 22 Jul 2026
- Source
- African Development Bank (AfDB)
ConstructChat
Ask ConstructChat about Multinational - Trans-Sahara Optical Fibre Backbone Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The multinational component of the Trans-Sahara Optical Fibre Backbone (TSB) Project aims to achieve the interconnection between Niger, Algeria, Nigeria and Chad through the laying of 1 510 kilometres of optical fibre cables. The project is a natural extension of the Trans-Saharan Highway (RTS). It has been attached to the Trans-Saharan Highway project to connect all concentrations of people on its route by road to other parts of the country and, beyond, the world. The proposed intervention consists of completing the missing links in Niger and Chad of the trans-Saharan ridge. The project intends to establish pilot data centres, eGovernment platforms and an Integrated Management System for the Electronic Identification of People (SIGIEP) in both countries. It also plans, among other things, to provide institutional support for the conduct of feasibility studies on the continuous implementation of the project, support ICT regulatory authorities and national agencies, academic institutions as well as a component that focuses on women’s empowerment. The project will contribute to reducing spatial exclusion and gaps in terms of existing transmission capacity in areaslocated within both countries, while laying the basis for the future development of e-Commerce, mobile financial services, e-Government, etc. It will be implemented over a four-year period from 2017 to 2020 for a total cost estimated at UA 62.262 million. |
Original sector | Communications |
Budget |
Location
Country | World |
Source
Source | African Development Bank (AfDB) |
URL |
More Details
Record type | Project |
Sector | Broadband, Power Generation (CCGT), Telecommunications, Education, Solar, Road, Government |
Article published date | 2025-03-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Broadband projects in Multinational
- Multinational - Other 3 Billion (O3B) Africa Limited Supplementary Loan
- Multinational - Valorization of African Medicinal Plant for Mainstreaming Entrepreneurship and Environment
- Chad - Trans-Saharan fiber optic backbone project (DTS) Chad component
- Multinational - East African Submarine Cable System (EASSY) Special Purpose Vehicle (SPV) Project
- Multinational - Feasibility study for Gabon-ICT backbone project
- Multinational - Upstream project for digital market development in Africa (UP4DMDA) – Phase 1
- Multinational - O3B Satellite Project
- AMELIORATION DES CAPACITES DE LA CICOS POUR LA GESTION DE L'INFORMATION SUR LE BASSIN DU CONGO
