Multinational - Trans-Sahara Optical Fibre Backbone Project
Sector: Broadband • Location: Multinational
Source: African Development Bank (AfDB)
The multinational component of the Trans-Sahara Optical Fibre Backbone (TSB) Project aims to achieve the interconnection between Niger, Algeria, Nigeria and Chad through the laying of 1 510 kilometres of optical fibre cables. The project is a natural extension of the Trans-Saharan Highway (RTS). It has been attached to the Trans-Saharan Highway project to connect all concentrations of people on it
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Obfuscated Data |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The multinational component of the Trans-Sahara Optical Fibre Backbone (TSB) Project aims to achieve the interconnection between Niger, Algeria, Nigeria and Chad through the laying of 1 510 kilometres of optical fibre cables. The project is a natural extension of the Trans-Saharan Highway (RTS). It has been attached to the Trans-Saharan Highway project to connect all concentrations of people on its route by road to other parts of the country and, beyond, the world. The proposed intervention consists of completing the missing links in Niger and Chad of the trans-Saharan ridge. The project intends to establish pilot data centres, eGovernment platforms and an Integrated Management System for the Electronic Identification of People (SIGIEP) in both countries. It also plans, among other things, to provide institutional support for the conduct of feasibility studies on the continuous implementation of the project, support ICT regulatory authorities and national agencies, academic institutions as well as a component that focuses on women’s empowerment. The project will contribute to reducing spatial exclusion and gaps in terms of existing transmission capacity in areaslocated within both countries, while laying the basis for the future development of e-Commerce, mobile financial services, e-Government, etc. It will be implemented over a four-year period from 2017 to 2020 for a total cost estimated at UA 62.262 million. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
