Multinational - Uganda – DRC Power Transmission Study
One of 4,322 projects Taiyo tracks in Multinational.
Source: African Development Bank (AfDB)
The proposed operation concerns a grant not exceeding US$ 925,000 to Nile Equatorial Lakes Subsidiary Action Program (NELSAP) for the purpose of the pre-investment study updates of 220 kV (400 kV) Uganda-DRC Power Interconnection Reinforcement Project Study. The project consists of update of Feasibility Study, Detailed Design, Bidding Documents, ESIA and RAP as pre-investment studies for construct
- Sector
- Power Transmission, Power Generation (CCGT), Government
- Location
- World
- Updated
- 22 Jul 2026
- Source
- African Development Bank (AfDB)
ConstructChat
Ask ConstructChat about Multinational - Uganda – DRC Power Transmission Study
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed operation concerns a grant not exceeding US$ 925,000 to Nile Equatorial Lakes Subsidiary Action Program (NELSAP) for the purpose of the pre-investment study updates of 220 kV (400 kV) Uganda-DRC Power Interconnection Reinforcement Project Study. The project consists of update of Feasibility Study, Detailed Design, Bidding Documents, ESIA and RAP as pre-investment studies for construction of a High Voltage transmission line and associated substations of Beni, Butembo, and Bunia and upgrade the Nkenda Substation. From Nkenda substation in Kasese Western Region of Uganda the line will continue up to Bunia and Butembo via Beni in the North Eastern region of DRC. The total distance of the line is estimated to 352.2 km. Strategically, the implementation and realisation of the project will promote regional cooperation for development and optimal utilisation of energy resources within the sub-region. Further, specifically in this case, this regional project will influence the implementation of the least-cost projects and coordination of this regional investment will involve significant savings in NPV terms for the region. The project will help deliver both physical (Interconnector and associated hardware) and institutional (agreements, rules, harmonized grid-codes, processes, skills, power trade, etc.) infrastructure. The total implementation period is estimated to Fourteen (14) months from approval comprising of eight (8) months for updating the studies preceded by six (6) months procurement process including negotiation and contract award. |
Original sector | Energy |
Budget |
Location
Country | World |
Source
Source | African Development Bank (AfDB) |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Power Generation (CCGT), Government |
Article published date | 2026-03-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Transmission projects in Multinational
- Multinational - The Interconnection of Electric Grids of Nile Equatorial Lakes Countries (Grant to the Republic of Burundi)
- Multinational- Ruzizi III regional hydropower plant project
- Multinational- Ruzizi III regional hydropower plant project (Rwanda)
- Multinational - The Interconnection of Electric Grids of Nile Equatorial Lakes Countries (Supplementary Loan to the Republic of Uganda)
- Multinational - Enhancing post-pandemic resilience and AfCTFA participation by developing SME and private sector
- Multinational - Côte d’Ivoire, Liberia, Sierra Leone and Guinea (CLSG) Electricity Networks Interconnection Project
- Multinational - Desert to Power Initiative West Africa Regional Energy Program – Phase I
- Multinational - Interconnection of the Electric Grids of the Nile Equatorial Lakes Countries