Multinational - Uganda – DRC Power Transmission Study

Sector: Power Transmission • Location: Multinational

Source: African Development Bank (AfDB)

The proposed operation concerns a grant not exceeding US$ 925,000 to Nile Equatorial Lakes Subsidiary Action Program (NELSAP) for the purpose of the pre-investment study updates of 220 kV (400 kV) Uganda-DRC Power Interconnection Reinforcement Project Study. The project consists of update of Feasibility Study, Detailed Design, Bidding Documents, ESIA and RAP as pre-investment studies for construct

Sector
Power Transmission, Power Generation (CCGT), Government
Location
World
Updated
22 Jul 2026
Source
African Development Bank (AfDB)

ConstructChat

Ask ConstructChat about Multinational - Uganda – DRC Power Transmission Study

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Multinational - Uganda – DRC Power Transmission Study” is an infrastructure initiative in the Power Transmission sector, located in Multinational. Taiyo aggregates data on it from African Development Bank (AfDB).

Participants

Sponsoring Agency

Status

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The proposed operation concerns a grant not exceeding US$ 925,000 to Nile Equatorial Lakes Subsidiary Action Program (NELSAP) for the purpose of the pre-investment study updates of 220 kV (400 kV) Uganda-DRC Power Interconnection Reinforcement Project Study. The project consists of update of Feasibility Study, Detailed Design, Bidding Documents, ESIA and RAP as pre-investment studies for construction of a High Voltage transmission line and associated substations of Beni, Butembo, and Bunia and upgrade the Nkenda Substation. From Nkenda substation in Kasese Western Region of Uganda the line will continue up to Bunia and Butembo via Beni in the North Eastern region of DRC. The total distance of the line is estimated to 352.2 km. Strategically, the implementation and realisation of the project will promote regional cooperation for development and optimal utilisation of energy resources within the sub-region. Further, specifically in this case, this regional project will influence the implementation of the least-cost projects and coordination of this regional investment will involve significant savings in NPV terms for the region. The project will help deliver both physical (Interconnector and associated hardware) and institutional (agreements, rules, harmonized grid-codes, processes, skills, power trade, etc.) infrastructure. The total implementation period is estimated to Fourteen (14) months from approval comprising of eight (8) months for updating the studies preceded by six (6) months procurement process including negotiation and contract award.

Original sector

Energy

Budget

Location

Country

World

Source

Source

African Development Bank (AfDB)

URL

More Details

Record type

Project

Sector

Power Transmission, Power Generation (CCGT), Government

Article published date

2025-12-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project