Multinational - Zizabona Power Interconnection Project
Sector: Power Generation (CCGT) • Location: Multinational
Source: African Development Bank (AfDB)
The ZIZABONA project aims at increasing trade in energy among Zimbabwe, Zambia, northern Malawi and north-eastern Mozambique. The project has been selected as a priority regional project under the AfDB regional integration strategy paper, and it is a segment of the Programme for Infrastructure Development in Africa (PIDA) interconnection corridor. When fully operational, the ZIZABONA transmission
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Obfuscated Data |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The ZIZABONA project aims at increasing trade in energy among Zimbabwe, Zambia, northern Malawi and north-eastern Mozambique. The project has been selected as a priority regional project under the AfDB regional integration strategy paper, and it is a segment of the Programme for Infrastructure Development in Africa (PIDA) interconnection corridor. When fully operational, the ZIZABONA transmission interconnector will, among other things, allow NamPower to import directly from Hwange in Zimbabwe. Currently, electricity from the Hwanga Power Station is routed to Namibia through South Africa. This Power interconnection when implemented would link directly the four important power national markets concerned, and strengthen the overall SAPP and enhance trade between all countries in the networks, including with South Africa. Additionally, it will promote increased trade within SADC by providing another power transmission corridor. NEPAD-IPPF grant is seeking a grant of US$1.9 million to support the ZIZABONA Members through SAPP to: 1) Update the Environmental Impact Assessment in Zambia because of the design changes; 2) To assess the economic and financial viability of the project; 3) To improve the design and structure of the project; 4) To improve project supervision and administration capacity of the SAPP. The duration of preparatory works is estimated to be eighteen (18) months from the date of contract signature and the SAPP will be the executing agency. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Power Generation (CCGT) projects in Multinational
- Multinational - Côte d’Ivoire, Liberia, Sierra Leone and Guinea (CLSG) Electricity Networks Interconnection Project
- Multinational - Desert to Power Initiative West Africa Regional Energy Program – Phase I
- Multinational - Post Cyclone Idai and Kenneth Emergency Recovery and Resilience Programme (PCIREP) – Mozambique
- Multinational - Interconnection of the Electric Grids of the Nile Equatorial Lakes Countries
- Multinational - Project to Interconnect the Power Grids from the Boali Hydro-Power System - Phase I
- Multinational - Ethiopia Djibouti Second Power Interconnection Project, Phase II - Ethiopia part
- Multinational - Baynes Hydro Power Project between Angola and Namibia 600 MW Advisory - Angola
- Multinational- Ruzizi III regional hydropower plant project (Burundi)
