logo

Multinational - Zizabona Power Interconnection Project

Sector: Power Generation (CCGT) • Location: Multinational

Source: African Development Bank (AfDB)

Project

The ZIZABONA project aims at increasing trade in energy among Zimbabwe, Zambia, northern Malawi and north-eastern Mozambique. The project has been selected as a priority regional project under the AfDB regional integration strategy paper, and it is a segment of the Programme for Infrastructure Development in Africa (PIDA) interconnection corridor. When fully operational, the ZIZABONA transmission

Project Information FAQ

Project Information

4 Q
The project “Multinational - Zizabona Power Interconnection Project” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Multinational. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The ZIZABONA project aims at increasing trade in energy among Zimbabwe, Zambia, northern Malawi and north-eastern Mozambique. The project has been selected as a priority regional project under the AfDB regional integration strategy paper, and it is a segment of the Programme for Infrastructure Development in Africa (PIDA) interconnection corridor. When fully operational, the ZIZABONA transmission interconnector will, among other things, allow NamPower to import directly from Hwange in Zimbabwe. Currently, electricity from the Hwanga Power Station is routed to Namibia through South Africa. This Power interconnection when implemented would link directly the four important power national markets concerned, and strengthen the overall SAPP and enhance trade between all countries in the networks, including with South Africa. Additionally, it will promote increased trade within SADC by providing another power transmission corridor. NEPAD-IPPF grant is seeking a grant of US$1.9 million to support the ZIZABONA Members through SAPP to: 1) Update the Environmental Impact Assessment in Zambia because of the design changes; 2) To assess the economic and financial viability of the project; 3) To improve the design and structure of the project; 4) To improve project supervision and administration capacity of the SAPP. The duration of preparatory works is estimated to be eighteen (18) months from the date of contract signature and the SAPP will be the executing agency.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data