Multinational - Zizabona Power Interconnection Project
One of 4,322 projects Taiyo tracks in Multinational.
Source: African Development Bank (AfDB)
The ZIZABONA project aims at increasing trade in energy among Zimbabwe, Zambia, northern Malawi and north-eastern Mozambique. The project has been selected as a priority regional project under the AfDB regional integration strategy paper, and it is a segment of the Programme for Infrastructure Development in Africa (PIDA) interconnection corridor. When fully operational, the ZIZABONA transmission
- Sector
- Forest Products and Packaging, Power Generation (CCGT), Government
- Location
- World
- Updated
- 22 Jul 2026
- Source
- African Development Bank (AfDB)
ConstructChat
Ask ConstructChat about Multinational - Zizabona Power Interconnection Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The ZIZABONA project aims at increasing trade in energy among Zimbabwe, Zambia, northern Malawi and north-eastern Mozambique. The project has been selected as a priority regional project under the AfDB regional integration strategy paper, and it is a segment of the Programme for Infrastructure Development in Africa (PIDA) interconnection corridor. When fully operational, the ZIZABONA transmission interconnector will, among other things, allow NamPower to import directly from Hwange in Zimbabwe. Currently, electricity from the Hwanga Power Station is routed to Namibia through South Africa. This Power interconnection when implemented would link directly the four important power national markets concerned, and strengthen the overall SAPP and enhance trade between all countries in the networks, including with South Africa. Additionally, it will promote increased trade within SADC by providing another power transmission corridor. NEPAD-IPPF grant is seeking a grant of US$1.9 million to support the ZIZABONA Members through SAPP to: 1) Update the Environmental Impact Assessment in Zambia because of the design changes; 2) To assess the economic and financial viability of the project; 3) To improve the design and structure of the project; 4) To improve project supervision and administration capacity of the SAPP. The duration of preparatory works is estimated to be eighteen (18) months from the date of contract signature and the SAPP will be the executing agency. |
Original sector | Energy |
Budget |
Location
Country | World |
Source
Source | African Development Bank (AfDB) |
URL |
More Details
Record type | Project |
Sector | Forest Products and Packaging, Power Generation (CCGT), Government |
Article published date | 2026-03-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Forest Products and Packaging projects in Multinational
- Multinational - Macroeconomic Stability and Financial Integration Project in Southern Africa Development Community
- Multinational - Ketta-Djoum Road Development and Yaoundé-Brazzaville Corridor Transport Facilitation Project – Phase 2 (Cameroon)
- Comoros - Climate Disaster Risk Financing Project
- Multinational - ECCAS Institutional Capacity Building Support Project (PARCI-ECCAS)
- Multinational - Ketta-Djoum Road Development and Yaoundé-Brazzaville Corridor Transport Facilitation Project – Phase 2 (République du Congo)
- Multinational - Micro-Entrepreneurship and Green Jobs in Natural Reserve for Vulnerable Populations in Ghana and Senegal
- Multinational - Conservation Concession in Equateur Province, DRC
- Multinational - Project to Support the Central African Unified Financial Market
