Multinational – 225 KV Côte d'Ivoire - Liberia Interconnection Reinforcement Project
One of 4,322 projects Taiyo tracks in Multinational.
Source: African Development Bank (AfDB)
The 225 kV Côte d’Ivoire – Liberia Interconnection Reinforcement aims to prepare pre-investment studies and project documents to be submitted to financiers for further appraisal. The Objective of the pre-investment studies is to support the Governments of Côte d’Ivoire and Liberia and their concerned power utilities, through the WAPP, to among others, (i) implement a feasibility study and carry ou
- Sector
- Power Transmission, Power Generation (CCGT), Road, Government
- Location
- World
- Updated
- 22 Jul 2026
- Source
- African Development Bank (AfDB)
ConstructChat
Ask ConstructChat about Multinational – 225 KV Côte d'Ivoire - Liberia Interconnection Reinforcement Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The 225 kV Côte d’Ivoire – Liberia Interconnection Reinforcement aims to prepare pre-investment studies and project documents to be submitted to financiers for further appraisal. The Objective of the pre-investment studies is to support the Governments of Côte d’Ivoire and Liberia and their concerned power utilities, through the WAPP, to among others, (i) implement a feasibility study and carry out preliminary engineering design at feasibility level; (ii) conduct a preliminary Line route survey for high voltage transmission, and (iii) conduct an Environmental and Social Impact Assessment. The preparatory phase shall bring the Project to a state ready for financing and also enable the national utilities to take the necessary steps to have the project registered with the national agencies in charge of environmental protection in the two countries, prior to commencement of construction activities. |
Original sector | Energy |
Budget |
Location
Country | World |
Source
Source | African Development Bank (AfDB) |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Power Generation (CCGT), Road, Government |
Article published date | 2025-03-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Transmission projects in Multinational
- Multinational - The Interconnection of Electric Grids of Nile Equatorial Lakes Countries (Grant to the Republic of Burundi)
- Multinational- Ruzizi III regional hydropower plant project
- Multinational- Ruzizi III regional hydropower plant project (Rwanda)
- Multinational - Uganda – DRC Power Transmission Study
- Multinational - The Interconnection of Electric Grids of Nile Equatorial Lakes Countries (Supplementary Loan to the Republic of Uganda)
- Multinational - Enhancing post-pandemic resilience and AfCTFA participation by developing SME and private sector
- Multinational - Côte d’Ivoire, Liberia, Sierra Leone and Guinea (CLSG) Electricity Networks Interconnection Project
- Multinational - Desert to Power Initiative West Africa Regional Energy Program – Phase I