Multinational – Feasibility Study for the Nsongezi Hydropower Plant
One of 4,322 projects Taiyo tracks in Multinational.
Source: African Development Bank (AfDB)
The Nsongezi Hydropower feasibility study project aims at investigating and producing a detailed technical, economic assessment of the proposed Nsongezi site, for the delivery of a detailed feasibility study report which will be aligned to an environmental and social impact assessment (ESIA) study that will be conducted. The Nsongezi Hydro Power Project (HPP) was identified as a priority project b
- Sector
- Hydro, Power Generation (CCGT), Commercial, Government
- Location
- World
- Updated
- 22 Jul 2026
- Source
- African Development Bank (AfDB)
ConstructChat
Ask ConstructChat about Multinational – Feasibility Study for the Nsongezi Hydropower Plant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Nsongezi Hydropower feasibility study project aims at investigating and producing a detailed technical, economic assessment of the proposed Nsongezi site, for the delivery of a detailed feasibility study report which will be aligned to an environmental and social impact assessment (ESIA) study that will be conducted. The Nsongezi Hydro Power Project (HPP) was identified as a priority project by East Africa Community (EAC). It is among the Heads of State Infrastructure priority projects. This is a greenfield project for which the feasibility study will include the preparation of specifications and tender documentation as well as a financial-economic study that will lead to the financing, procurement, and construction of the power plant and associated transmission infrastructure. The project aligns well with the objectives and operational priorities of the NEPAD-IPPF and will increase the stock of bankable projects available to investment. The estimated overall duration of the studies is about twenty-four (24) calendar months, post procurement process. The total cost is estimated at USD US$ 1,141,618. Of this amount, NEPAD-IPPF will provide a non-reimbursable grant of US$ 1,083,618 (95%). Project Sponsor contribution (EAC) is US$ 58,000 (5%) (cash contribution). The use of NEPAD-IPPF grant funding to investigate the Nsongezi site will contribute to reduced cost on the project sponsor’s cost of developing the project. |
Original sector | Energy |
Budget |
Location
Country | World |
Source
Source | African Development Bank (AfDB) |
URL |
More Details
Record type | Project |
Sector | Hydro, Power Generation (CCGT), Commercial, Government |
Article published date | 2026-03-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Hydro projects in Multinational
- Ghana - Togo - Benin Power Interconnect
- Multinational- Ruzizi III regional hydropower plant project
- Multinational - Scaling-up the Clean Cooking Industry in Africa
- Multinational- Ruzizi III regional hydropower plant project (Rwanda)
- Multinational - Study on the Development of Inga Hydropower Site and Associated Power Interconnections
- Multinational - Programme to Build Resilience to Food and Nutrition Insecurity in the Sahel (P2RS)
- Multinational - The Interconnection of Electric Grids of Nile Equatorial Lakes Countries (Supplementary Loan to the Republic of Uganda)
- Multinational - Project for the Integrated Management of Invasive Aquatic Weeds in West Africa - Gambia component
