logo
Project

Multinational – Feasibility Study for the Nsongezi Hydropower Plant

Sector: Commercial • Location: Multinational

Source: African Development Bank (AfDB)

The Nsongezi Hydropower feasibility study project aims at investigating and producing a detailed technical, economic assessment of the proposed Nsongezi site, for the delivery of a detailed feasibility study report which will be aligned to an environmental and social impact assessment (ESIA) study that will be conducted. The Nsongezi Hydro Power Project (HPP) was identified as a priority project b

Sector
Commercial, Power Generation (CCGT), Hydro, Government
Location
World
Updated
22 Jul 2026
Source
African Development Bank (AfDB)

ConstructChat

Ask ConstructChat about Multinational – Feasibility Study for the Nsongezi Hydropower Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Multinational – Feasibility Study for the Nsongezi Hydropower Plant” is an infrastructure initiative in the Commercial sector, located in Multinational. Taiyo aggregates data on it from African Development Bank (AfDB).

Participants

Sponsoring Agency

Status

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Nsongezi Hydropower feasibility study project aims at investigating and producing a detailed technical, economic assessment of the proposed Nsongezi site, for the delivery of a detailed feasibility study report which will be aligned to an environmental and social impact assessment (ESIA) study that will be conducted. The Nsongezi Hydro Power Project (HPP) was identified as a priority project by East Africa Community (EAC). It is among the Heads of State Infrastructure priority projects. This is a greenfield project for which the feasibility study will include the preparation of specifications and tender documentation as well as a financial-economic study that will lead to the financing, procurement, and construction of the power plant and associated transmission infrastructure. The project aligns well with the objectives and operational priorities of the NEPAD-IPPF and will increase the stock of bankable projects available to investment. The estimated overall duration of the studies is about twenty-four (24) calendar months, post procurement process. The total cost is estimated at USD US$ 1,141,618. Of this amount, NEPAD-IPPF will provide a non-reimbursable grant of US$ 1,083,618 (95%). Project Sponsor contribution (EAC) is US$ 58,000 (5%) (cash contribution). The use of NEPAD-IPPF grant funding to investigate the Nsongezi site will contribute to reduced cost on the project sponsor’s cost of developing the project.

Original sector

Energy

Budget

Location

Country

World

Source

Source

African Development Bank (AfDB)

URL

More Details

Record type

Project

Sector

Commercial, Power Generation (CCGT), Hydro, Government

Article published date

2025-12-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project