Multinational – Feasibility Study for the Nsongezi Hydropower Plant

Sector: Commercial • Location: Multinational

Source: African Development Bank (AfDB)

Project

The Nsongezi Hydropower feasibility study project aims at investigating and producing a detailed technical, economic assessment of the proposed Nsongezi site, for the delivery of a detailed feasibility study report which will be aligned to an environmental and social impact assessment (ESIA) study that will be conducted. The Nsongezi Hydro Power Project (HPP) was identified as a priority project b

Project Information FAQ

Project Information

4 Q
The project “Multinational – Feasibility Study for the Nsongezi Hydropower Plant” is an infrastructure initiative in the Commercial sector, located in Multinational. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Nsongezi Hydropower feasibility study project aims at investigating and producing a detailed technical, economic assessment of the proposed Nsongezi site, for the delivery of a detailed feasibility study report which will be aligned to an environmental and social impact assessment (ESIA) study that will be conducted. The Nsongezi Hydro Power Project (HPP) was identified as a priority project by East Africa Community (EAC). It is among the Heads of State Infrastructure priority projects. This is a greenfield project for which the feasibility study will include the preparation of specifications and tender documentation as well as a financial-economic study that will lead to the financing, procurement, and construction of the power plant and associated transmission infrastructure. The project aligns well with the objectives and operational priorities of the NEPAD-IPPF and will increase the stock of bankable projects available to investment. The estimated overall duration of the studies is about twenty-four (24) calendar months, post procurement process. The total cost is estimated at USD US$ 1,141,618. Of this amount, NEPAD-IPPF will provide a non-reimbursable grant of US$ 1,083,618 (95%). Project Sponsor contribution (EAC) is US$ 58,000 (5%) (cash contribution). The use of NEPAD-IPPF grant funding to investigate the Nsongezi site will contribute to reduced cost on the project sponsor’s cost of developing the project.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data