logo

Multinational Guinea / Guinea-Bissau - The Boke - Quebo Road Study

Sector: Raw Materials • Location: Multinational

Source: African Development Bank (AfDB)

Project

The present study concerns the Boké-Quebo road, part of which is in Guinean territory and the other in Guinea-Bissau territory. As such, the study is part of the policy of spatial planning and development of agricultural potential in both countries. The lack of development of the approximately 112 km long Boké-Québo road delays the opening up of the regions with high agricultural potential thus cr

Project Information FAQ

Project Information

4 Q
The project “Multinational Guinea / Guinea-Bissau - The Boke - Quebo Road Study” is an infrastructure initiative in the Raw Materials sector, located in Multinational. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The present study concerns the Boké-Quebo road, part of which is in Guinean territory and the other in Guinea-Bissau territory. As such, the study is part of the policy of spatial planning and development of agricultural potential in both countries. The lack of development of the approximately 112 km long Boké-Québo road delays the opening up of the regions with high agricultural potential thus crossed in the two countries and strongly handicaps the integration effort of the sub-region. The completion of this study will enable the two governments to determine the best management solution for the Boké - Québo road, the realization of which will not only open up the areas crossed, but also promote regional economic integration. It will comprise two successive phases: A) Phase I: resumption of the topographical study, updating of the economic and technical feasibility study, realization of the environmental and socio-economic studies and realization of a study in terms of networks integrating the related rural roads and modes of intermediate transport and B) Phase II: Detailed technical study and preparation of bidding documents for the development solution of the Boké-Québo axis that will be retained at the end of the first phase. The estimated cost of the study is UA 0.99 million. The duration of execution will be fifteen (15) months.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data