Mumba Solar Mini-Grid
The status, timeline and source of this project. A free account opens every field.
Source: United Nations Industrial Development Organization (UNIDO)
The Mumba Solar Mini-Grid (SMG) Project involves the establishment of a (SMG) in Mumba Village of Malole Constituency in Mungwi District, Northern Province. This will involve the installation of a minimum 28.42kWp solar power generating system and the construction of a total of 4km of 400V overhead line. The residents of this community mainly depend on firewood and charcoal as the main sources of
- Status
- Closed
- Sector
- Energy Storage, Power Generation (CCGT), Solar, Rail, Government, Manufacturing (Industrial)
- Location
- Luwingu District, Zambia
- Updated
- 22 Jul 2026
- Source
- United Nations Industrial Development Organization (UNIDO)
ConstructChat
Ask ConstructChat about Mumba Solar Mini-Grid
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Mumba Solar Mini-Grid (SMG) Project involves the establishment of a (SMG) in Mumba Village of Malole Constituency in Mungwi District, Northern Province. This will involve the installation of a minimum 28.42kWp solar power generating system and the construction of a total of 4km of 400V overhead line. The residents of this community mainly depend on firewood and charcoal as the main sources of energy for cooking and heating, while solar and other batteries are used for lighting and entertainment. This project envisions to electrify an estimated 400 households, 2 schools and other institutions using a combination of SHS and SMG. The project also envisions to promote the use of the EaaS business model in the billing system of off-grid solutions through the use of Pay as you Go (PAYGO) approach. This Project is profitable with positive incomes from start year to its end life with a profit of K108, 391.31 ($6, 021.74) at K18 exchange rate in its first year of operation. The Project is also economically viable at the respective tariffs with ENPV of K5.5m ($305,555.56), EIRR of 24% and with a life span of 20 years. The Project is open for FDI through a majority stake and the Rural Electrification Authority (REA) will facilitate the project. Estimated cost for this project is $321,613.36, consisting of the generation facility at $148,668.42, distribution network and metering $84,240, and installation works at $88,704.95 respectively. Alternatively, REA could develop the sites and engage a private company through a management contract to oversee operations and maintenance of the project sites. The project is also viable with a capital subsidy of 100% from REA and the issuance of these subsidies is guided by the Framework for Managing Capital Smart Subsidies in Zambia and The Guidelines for Financing Rural Electrification Projects in Zambia. |
Original sector | Production, transmission and distribution of electricity |
Location
Country | Zambia |
City | Luwingu District |
Source
Source reliability | High |
Source | United Nations Industrial Development Organization (UNIDO) |
URL |
More Details
Record type | Project |
Sector | Energy Storage, Power Generation (CCGT), Solar, Rail, Government, Manufacturing (Industrial) |
Article published date | 2023-05-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
