logo

Mumba Solar Mini-Grid

Sector: Energy Storage • Location: Luwingu District, Zambia

Source: United Nations Industrial Development Organization (UNIDO)

Project

The Mumba Solar Mini-Grid (SMG) Project involves the establishment of a (SMG) in Mumba Village of Malole Constituency in Mungwi District, Northern Province. This will involve the installation of a minimum 28.42kWp solar power generating system and the construction of a total of 4km of 400V overhead line. The residents of this community mainly depend on firewood and charcoal as the main sources of

Project Information FAQ

Project Information

4 Q
The project “Mumba Solar Mini-Grid” is an infrastructure initiative in the Energy Storage sector, located in Luwingu District, Zambia. Taiyo aggregates data on it from United Nations Industrial Development Organization (UNIDO).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Mumba Solar Mini-Grid (SMG) Project involves the establishment of a (SMG) in Mumba Village of Malole Constituency in Mungwi District, Northern Province. This will involve the installation of a minimum 28.42kWp solar power generating system and the construction of a total of 4km of 400V overhead line. The residents of this community mainly depend on firewood and charcoal as the main sources of energy for cooking and heating, while solar and other batteries are used for lighting and entertainment. This project envisions to electrify an estimated 400 households, 2 schools and other institutions using a combination of SHS and SMG. The project also envisions to promote the use of the EaaS business model in the billing system of off-grid solutions through the use of Pay as you Go (PAYGO) approach. This Project is profitable with positive incomes from start year to its end life with a profit of K108, 391.31 ($6, 021.74) at K18 exchange rate in its first year of operation. The Project is also economically viable at the respective tariffs with ENPV of K5.5m ($305,555.56), EIRR of 24% and with a life span of 20 years. The Project is open for FDI through a majority stake and the Rural Electrification Authority (REA) will facilitate the project. Estimated cost for this project is $321,613.36, consisting of the generation facility at $148,668.42, distribution network and metering $84,240, and installation works at $88,704.95 respectively. Alternatively, REA could develop the sites and engage a private company through a management contract to oversee operations and maintenance of the project sites. The project is also viable with a capital subsidy of 100% from REA and the issuance of these subsidies is guided by the Framework for Managing Capital Smart Subsidies in Zambia and The Guidelines for Financing Rural Electrification Projects in Zambia.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data