Mumbai-Ahmedabad Bullet Train Project: 16 Km BKC-Sawli Tunnel Construction
Sector: Rail • Location: Mumbai, Maharashtra, India
Source: Swarajyamag
The project involves the construction of a 16 km long tunnel between Bandra Kurla Complex (BKC) and Sawli near Ghansoli as part of the Mumbai-Ahmedabad Bullet Train project. This tunnel includes India's first 7 km undersea section beneath Thane Creek and is designed as a single tube structure with a diameter of 13.1 meters to accommodate twin tracks. The tunnel depth ranges from 25 to 57 meters be
- Status
- Under Construction
- Sector
- Rail, Tunnel
- Location
- Mumbai, Maharashtra, India
- Updated
- 22 Jul 2026
- Source
- Swarajyamag
ConstructChat
Ask ConstructChat about Mumbai-Ahmedabad Bullet Train Project: 16 Km BKC-Sawli Tunnel Construction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involves the construction of a 16 km long tunnel between Bandra Kurla Complex (BKC) and Sawli near Ghansoli as part of the Mumbai-Ahmedabad Bullet Train project. This tunnel includes India's first 7 km undersea section beneath Thane Creek and is designed as a single tube structure with a diameter of 13.1 meters to accommodate twin tracks. The tunnel depth ranges from 25 to 57 meters below ground level, reaching a maximum depth of 114 meters below Parsik hill. Tunnel Boring Machines (TBMs) are being assembled and deployed for this complex underground and underwater tunneling operation. |
Original sector | Transport |
Location
Country | India |
State | Maharashtra |
City | Mumbai |
Source
Source | Swarajyamag |
URL |
More Details
Record type | Project |
Sector | Rail, Tunnel |
Article published date | 2026-04-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
