logo

Mumbai-Ahmedabad Bullet Train Project

Sector: Rail • Location: Mumbai, Ahmedabad, Surat, and other cities along the corridor, Gujarat and Maharashtra, India

Source: Oneindia

Project
Under Construction

The Mumbai-Ahmedabad High-Speed Rail Corridor (MAHSR) is a 508 km high-speed rail corridor linking key cities including Sabarmati, Ahmedabad, Anand, Vadodara, Bharuch, Surat, Bilimora, Vapi, Boisar, Virar, Thane, and Mumbai. The project employs advanced engineering techniques with 85% of the route constructed on viaducts to minimize land disturbance and enhance safety. 326 km of viaduct work and 1

Project Information FAQ

Project Information

3 Q
The project “Mumbai-Ahmedabad Bullet Train Project” is an infrastructure initiative in the Rail sector, located in Mumbai, Ahmedabad, Surat, and other cities along the corridor, Gujarat and Maharashtra, India. Taiyo aggregates data on it from Oneindia.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

under construction

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Mumbai-Ahmedabad High-Speed Rail Corridor (MAHSR) is a 508 km high-speed rail corridor linking key cities including Sabarmati, Ahmedabad, Anand, Vadodara, Bharuch, Surat, Bilimora, Vapi, Boisar, Virar, Thane, and Mumbai. The project employs advanced engineering techniques with 85% of the route constructed on viaducts to minimize land disturbance and enhance safety. 326 km of viaduct work and 17 out of 25 river bridges have been completed. The Surat-Bilimora section of 47 km is nearing completion with civil works and track-bed laying fully completed. The Surat station design is inspired by the city's diamond industry and offers multi-modal connectivity.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data