logo

Mumbai-Ahmedabad Bullet Train Project

Sector: Rail • Location: Mumbai, Ahmedabad, Surat, Vapi, Vadodara, Thane, Virar, Boisar, Bilimora, Bharuch, Anand, Sabarmati, Maharashtra and Gujarat, India

Source: Equitymaster

Project
Under Construction

The project aims to create India's first high-speed rail corridor between Mumbai and Ahmedabad, covering 508 km. It will reduce travel time to about 2 hours 7 minutes at speeds up to 320 km/h, with four stops on the route. The project uses Japanese Shinkansen technology and includes advanced construction techniques such as ballastless tracks and multiple tunnels, including a 21 km tunnel under Tha

Project Information FAQ

Project Information

5 Q
The project “Mumbai-Ahmedabad Bullet Train Project” is an infrastructure initiative in the Rail sector, located in Mumbai, Ahmedabad, Surat, Vapi, Vadodara, Thane, Virar, Boisar, Bilimora, Bharuch, Anand, Sabarmati, Maharashtra and Gujarat, India. Taiyo aggregates data on it from Equitymaster.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

under construction

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project aims to create India's first high-speed rail corridor between Mumbai and Ahmedabad, covering 508 km. It will reduce travel time to about 2 hours 7 minutes at speeds up to 320 km/h, with four stops on the route. The project uses Japanese Shinkansen technology and includes advanced construction techniques such as ballastless tracks and multiple tunnels, including a 21 km tunnel under Thane Creek with a 7 km undersea section. The inaugural run is planned for August 2027, initially covering a 100 km stretch between Surat and Vapi, with full operation expected by December 2029.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data