logo

Mumbai-Ahmedabad Bullet Train Project

Sector: Rail • Location: Mumbai, Ahmedabad, Surat, Vadodara, Bharuch, Bilimora, Vapi, Virar, Boisar, Gujarat, Maharashtra, India

Source: Swarajyamag

Project
Under Construction

The Mumbai-Ahmedabad bullet train project is a 508-kilometer high-speed rail corridor in India. Significant construction milestones have been achieved, including completion of viaduct construction over 317 kilometers, pier works over 396 kilometers, and pier foundations over 407 kilometers. The project includes bridges over 17 rivers, steel and PSC bridges, track bed construction, noise barrier in

Project Information FAQ

Project Information

5 Q
The project “Mumbai-Ahmedabad Bullet Train Project” is an infrastructure initiative in the Rail sector, located in Mumbai, Ahmedabad, Surat, Vadodara, Bharuch, Bilimora, Vapi, Virar, Boisar, Gujarat, Maharashtra, India. Taiyo aggregates data on it from Swarajyamag.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

under construction

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Mumbai-Ahmedabad bullet train project is a 508-kilometer high-speed rail corridor in India. Significant construction milestones have been achieved, including completion of viaduct construction over 317 kilometers, pier works over 396 kilometers, and pier foundations over 407 kilometers. The project includes bridges over 17 rivers, steel and PSC bridges, track bed construction, noise barrier installations, overhead equipment mast installations, and tunnel excavation. Structural work on eight bullet train stations in Gujarat is complete, with interior and finishing work ongoing. Construction on three elevated stations in Maharashtra has commenced, with base slab casting in progress for Mumbai station and slab casting completed for Virar and Boisar stations. The project aims to modernize India's rail infrastructure and reduce travel time between Mumbai and Ahmedabad.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data