Mumbai-Ahmedabad Bullet Train Tunnel Breakthrough at Ghansoli
One of 10,000+ projects Taiyo tracks in Maharashtra.
Source: ETV Bharat
A 4.88 km-long tunnel between Shilphata and Ghansoli for the Mumbai-Ahmedabad bullet train project has achieved breakthrough. The tunnel excavation was carried out simultaneously from both sides through challenging underwater terrain using the New Austrian Tunnel Method (NATM). This tunnel is part of a 21 km underground stretch including a 7-km segment beneath Thane Creek. The project includes adv
- Status
- Under Construction
- Sector
- Tunnel, Bridge, Rail, Government
- Location
- Mumbai, Maharashtra, India
- Updated
- 22 Jul 2026
- Source
- ETV Bharat
ConstructChat
Ask ConstructChat about Mumbai-Ahmedabad Bullet Train Tunnel Breakthrough at Ghansoli
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A 4.88 km-long tunnel between Shilphata and Ghansoli for the Mumbai-Ahmedabad bullet train project has achieved breakthrough. The tunnel excavation was carried out simultaneously from both sides through challenging underwater terrain using the New Austrian Tunnel Method (NATM). This tunnel is part of a 21 km underground stretch including a 7-km segment beneath Thane Creek. The project includes advanced engineering innovations such as single tunnel technology to accommodate two bullet trains and deployment of 40-meter girders in viaduct construction. The first phase of the high-speed corridor on the Surat-Bilimora section is planned to start in December 2027. |
Original sector | Transport |
Location
Country | India |
State | Maharashtra |
City | Mumbai |
Source
Source | ETV Bharat |
URL |
More Details
Record type | Project |
Sector | Tunnel, Bridge, Rail, Government |
Article published date | 2025-09-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Tunnel projects in India
- Koldam Hydroelectric Power Plant
- Chenani Nashri Tunnelway Limited (CTNL)
- Thiruvananthapuram Road Development Company Limited
- Aurangabad Barwa Adda Expressway Limited
- Sion Panvel Tollways Private Limited
- Kundli Manesar Palwal Expressway
- Jorabat Shillong Expressway Limited (JSEL)
- Ahmedabad-Mehsana Toll Road Ltd. (AMTRL)
